Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supplying, Fabrication, Erection On Suitable Rcc Foundation And Commissioning Including 3 (Three) Months Trial Run And 5 (Five) Years Operation And Maintenance Including Cost Of Routine Testing Of Water Sample For Performance Evaluation Of Pressure T
|
| Description |
Supplying, Fabrication, Erection On Suitable Rcc Foundation And Commissioning Including 3 (Three) Months Trial Run And 5 (Five) Years Operation And Maintenance Including Cost Of Routine Testing Of Water Sample For Performance Evaluation Of Pressure T
|
| Organisation | MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT |
| Tender Id | 2025_MAD_804917_1 |
|
Reference Number |
20/AMRUT 2.0/SE(CC)/2024-25/2nd Call |
| Tender Fee | 0 |
| EMD | 2 Lakh |
| Tender Value | - |
| Place | Buniadpur Municipality |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1788048 |
| Start Date | January 27, 2025 15:30 |
| End Date |
Expired
15/02/2025
Expired 608 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta
Read moreProcurement, installation, testing and commissioning of ocems for influent monitoring along with 06 months free trial run at 04 mld sewage treatment plant, omara, under operational control of ueed, udhampur under jal hi amrit initiative of amrut 2.0.
Procurement, installation, testing and commissioning of ocems for influent monitoring along with 06 months free trial run at 04 mld sewage treatment plant, omara, under operational control of ueed, udhampur under jal hi amrit initiative of amrut 2.0.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years operation and maintenance including cost of routine testing of water sample for performance evaluation of pressure t
Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years operation and maintenance including cost of routine testing of water sample for performance evaluation of pressure t
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years o m (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal pla
Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years o m (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal pla
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years o m (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal pla
Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years o m (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal pla
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years o m (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal pla
Supplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) years o m (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal pla
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Supplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Supplying, fabrication, erection on suitable rcc foundation and commissioning with 3 (three) months trial run (including cost of routine testing of water sample for performance evaluation) of pressure type iron removal plant as per design norms of th
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) ..etc. with common manifold connection for the water supply scheme within maynaguri municipality under amrut 2.
Supplying, fabrication, erection on suitable rcc&#x0d foundation and commissioning including 3 (three) months trial run and 5 (five) ..etc. with common manifold connection for the water supply scheme within maynaguri municipality under amrut 2.
Read moreof your Industry type