Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Engineering, Supply, Storage, Installation, Commissioning, Trial Run And Five Years Operation And Maintenance Of Clear Water Pumping Station With Power Distribution System Located At Rangamati I Under Amrut Within Midnapore Municipality
|
| Description |
Design, Engineering, Supply, Storage, Installation, Commissioning, Trial Run And Five Years Operation And Maintenance Of Clear Water Pumping Station With Power Distribution System Located At Rangamati I Under Amrut Within Midnapore Municipality
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_MAD_624354_1 |
|
Reference Number |
WBMAD/ULB/MID/CM/eNIT170/23-24 |
| Tender Fee | 0 |
| EMD | 2 Lakh |
| Tender Value | 0 |
| Place | MIDNAPORE MUNICIPALITY |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | December 19, 2023 15:30 |
| End Date |
Expired
15/01/2024
Expired 1006 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement, installation, testing and commissioning of ocems for influent monitoring along with 06 months free trial run at 04 mld sewage treatment plant, omara, under operational control of ueed, udhampur under jal hi amrit initiative of amrut 2.0.
Procurement, installation, testing and commissioning of ocems for influent monitoring along with 06 months free trial run at 04 mld sewage treatment plant, omara, under operational control of ueed, udhampur under jal hi amrit initiative of amrut 2.0.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreProviding, installing and commissioning with satisfactory testing and trial run of centrifugal hsc pump set for clear water pumping at ranjhi tp.
Providing, installing and commissioning with satisfactory testing and trial run of centrifugal hsc pump set for clear water pumping at ranjhi tp.
Read moreSupply and supervision till trial and run of pumping plants at 200 mld kukrail sps
Supply and supervision till trial and run of pumping plants at 200 mld kukrail sps
Read moreSupply and supervision till trial run of pumping plants at 200 mld kukrail sps lucknow
Supply and supervision till trial run of pumping plants at 200 mld kukrail sps lucknow
Read moreSupplying, fabrication, erection on suitable rcc foundation and commissioning including 3 (three) months trial run and 5 (five) ..etc. with common manifold connection for the water supply scheme within maynaguri municipality under amrut 2.
Supplying, fabrication, erection on suitable rcc&#x0d foundation and commissioning including 3 (three) months trial run and 5 (five) ..etc. with common manifold connection for the water supply scheme within maynaguri municipality under amrut 2.
Read moreAmrut-amrut 2 .0 - providing additional pump at thiruvalla pump house for pumping additional water to kombadi tank and providing chlorinators-amrut 2.0 - supply erection testing and commissioning of new clear water centrifugal pump at clear water
Amrut-amrut 2. 0 - providing additional pump at thiruvalla pump house for pumping additional water to kombadi tank and providing chlorinators-amrut 2.0 - supply erection testing and commissioning of new clear water centrifugal pump at clear water
Read moreConstruction erection testing commissioning and trial run of 0.75 mld capacity sewerage treatment plant based on moving bed bioflim reactor mbbr technology in palamuru university mahabubnagartelangana
Construction erection testing commissioning and trial run of 0.75 mld capacity sewerage treatment plant based on moving bed bioflim reactor mbbr technology in palamuru university mahabubnagartelangana
Read moreConstruction, erection, testing, commissioning and trial run of 0.75 mld capacity sewerage treatment plant based on moving bed bioflim reactor (mbbr) technology in palamuru university, mahabubnagar, telangana
Construction, erection, testing, commissioning and trial run of 0.75 mld capacity sewerage treatment plant based on moving bed bioflim reactor (mbbr) technology in palamuru university, mahabubnagar, telangana
Read moreImplementation of wss in jorhat town (urban area) including 3 (three) months trial run and 7 (seven) years o and m of jorhat phe div under sopd-g
Implementation of water supply scheme with 24 x 7 drink-from-tap facility in jorhat town (urban area) including 3 (three) months trial run and 7 (seven) years operation and maintenance of jorhat phe division under the programme sopd-g
Read moreof your Industry type