AMRUT 2 0 Design Construction Commissioning Trial Running Operation and Maintenance for a period of 5 years of 5 MLD STP at Alissery along with 11 876 Km Sewage Collection Network in Ward No34 and 35 Old of Alappuzha Municipality and allied works
Kerala Water Authority | Chief Engineer Sewerage | Superintending Engineer Sewerage Circle Kochi · Kerala
- Tender value
- ₹49.55 Crore
- EMD
- ₹5 Lakh
- Tender fee
- ₹19,518
Want us to file this bid for you?
Our team reads the tender documents, checks your eligibility, prepares the documents and files the bid on the portal before the deadline.
Tender details
- Tender ID
- Sign in to view
- Reference number
- Sign in to view
- Organisation
- Kerala Water Authority | Chief Engineer Sewerage | Superintending Engineer Sewerage Circle Kochi
- Location
- Kerala
- Bids open
- 21 Nov 2026, 5:00 PM
- Bids close
- 4 Dec 2026, 3:00 PM
- Tender value
- ₹49.55 Crore
- EMD
- ₹5 Lakh
- Tender fee
- ₹19,518
Similar tenders
-
Construction of Treated Sewage Pumping Station for 56 MLD STP Govindpuram, Ghaziabad
Ghaziabad Development Authority · Uttar Pradesh Closes 18 Dec 2026
View tender -
Construction of 5 MLD Capacity Sewage Treatment Plant with Co-treatment at Elamkulam for Kochi Corporation under AMRUT 2.0
Design construction and commissioning of 5 MLD capacity Sewage Treatment Plant STP with co-treatment based on MBBR technology Inclusive of all mechanical and electrical components followed by Operation and Maintenance for 5 years
Kerala Water Authority | Chief Engineer Sewerage | Superintending Engineer Sewerage Circle Kochi · Kerala Closes 4 Dec 2026
View tender -
Construction and Commissioning of 100 MLD Sewage Treatment Plant in replacement of the existing 78 MLD STP at Dhandhupura, Agra, including Associated Works, Bypass Arrangements and Interconnection of Existing Rising Mains.
U P Jal Nigam (HQ), Lucknow | Chief Engineer (Agra) | GM, Yamuna Pollution Control Unit, Agra | PM, Construction Unit, Agra · Uttar Pradesh Closes 25 Nov 2026
View tender -
Running, Operation, watch, ward and daily routine check-up, preventive maintenance and cleaning etc. work of 80 MLD Dinapur STP at Varanasi.
U P Jal Nigam (HQ), Lucknow | Chief Engineer (E-M), Lucknow | SE, Inspection Wing (Circle), Lucknow | EE 3rd Construction Division (E/M) Faizabad · Uttar Pradesh Closes 27 Nov 2026
View tender -
Construction of TTRO plant for Re-use of Treate sewage from 11 MLD Brah STP for NTPC Brah, Bihar including 15 years O&M.
Government of Bihar | eProc2 Bihar · Bihar Closes 10 Dec 2026
View tender -
Construction and Commissioning of 08 MLD Sewage Treatment Plant in replacement of the existing 08 MLD STP at Manth Road, Vrindavan, District Mathura including Associated Works, Bypass Arrangements and Interconnection of Existing Rising Mains.
U P Jal Nigam (HQ), Lucknow | Chief Engineer (Kanpur) | GM, Ganga Pollution Control Unit, Kanpur | PM, Ganga Pollution Control Unit (3rd), Kanpur · Uttar Pradesh Closes 26 Nov 2026
View tender -
AMRUT-UWSS TO PUNALUR MUNICIPALITY-Design, Construction,trial run and Commissioning of 16 MLD out put capacity WTP (Lamella Clarifier) at Punalur and Supplying and Laying 500mm DI K9 raw water pumping main from the intake well to the proposed 16 MLD
Kerala Water Authority | Chief Engineer Southern Region (Trivandrum) | Superintending Engineer (PH Circle Kollam) · Kerala Closes 9 Dec 2026
View tender -
(96578) Supply, Erection, Installation, Testing and Commissioning of pumping machinery and allied work at 37.5 MLD capacity Sewage Treatment Plant at Sec -20, Sanpada in Turbhe Ward under Jal Hi Amrut fund.
Navi Mumbai Municipal Corporation | City Engineer Department | EE Sewerage · Maharashtra Closes 25 Nov 2026
View tender -
AMRUT 2 Kochi Corporation Providing underground sewerage networks and allied works for the newly proposed 5MLD STP at Elamkulam Design Laying Construction Commissioning and Maintenance 5years of 1723 km Sewage Network
Kerala Water Authority | Chief Engineer Sewerage | Superintending Engineer Sewerage Circle Kochi · Kerala Closes 4 Dec 2026
View tender -
Designing, Construction and Commissioning of 20 MLD capacity STP on SBR technology with Tertiary Treatment to achieve the required parameters, Elevated Equilization Tank etc with 03 Months trial run, 11 years of O and M with 6 years DLP at Surajkund
Haryana Government | FMDA | Infra-II · Haryana Closes 11 Dec 2026
View tender