Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Bearing Gh 1232 Related To Chp For Wagon Tripler Under Chp Mm Dept., Btps.
|
| Description |
Procurement Of Bearing Gh 1232 Related To Chp For Wagon Tripler Under &Amp#X0d
Chp Mm Dept., Btps.&Amp#X0d
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_868738_1 |
|
Reference Number |
WBPDCL/BTPS/NIT/E2636/25-26 |
| Tender Fee | 0 |
| EMD | 18900 |
| Tender Value | - |
| Place | Bandel Thermal Power Station, Hooghly |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1953509 |
| Start Date | June 30, 2025 20:30 |
| End Date |
Expired
04/08/2025
Expired 433 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-ktps-vii stage-mm-chp- procurement of pivot bearings for wagon tippler in chp
Tggenco-ktps-vii stage-mm-chp- procurement of pivot bearings for wagon tippler in chp
Read moreSupply of various types of special electrodes for mm/chp/btps
Supply of various types of special electrodes for mm/chp/btps
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreSupply of electromagnetic type suspension magnet required by lt-1/o and e/chp/ btps
Supply of electromagnetic type suspension magnet required by lt-1/o and e/chp/ btps
Read moreKtps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreSupply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Read moreProcurement of elgi make spares for screw type air compressors of bobrn wagon unloading and dry fog dust suppression systems working in chp at stpp, jaipur, mancherial, telangana
Procurement of elgi make spares for screw type air compressors of bobrn wagon unloading and dry fog dust suppression systems working in chp at stpp, jaipur, mancherial, telangana
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreof your Industry type