Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Electromagnetic Type Suspension Magnet Required By Lt 1/O And E/Chp/ Btps
|
| Description |
Supply Of Electromagnetic Type Suspension Magnet Required By Lt 1/O And E/Chp/ Btps
|
| Organisation | TELANGANA POWER GENERATION CORPORATION LIMITED-CE CONSTRUCTION BTPS |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 0 |
| Place | Telangana |
| Link | Login to view |
| Start Date | September 22, 2026 18:00 |
| End Date |
Closing soon
13/10/2026
2 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreSupply of various types of special electrodes for mm/chp/btps
Supply of various types of special electrodes for mm/chp/btps
Read moreProcurement of nylon tarpauline required in chp of rtps
Procurement of nylon tarpauline required in chp of rtps
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreSupply of spare materials required for maintenance of fountains inside the plant of btps
Supply of spare materials required for maintenance of fountains inside the plant of btps
Read moreProcurement of hydraulic system spares required for stacker cum reclaimers working in chp at stpp, jaipur, mancherial, telangana.
Procurement of hydraulic system spares required for stacker cum reclaimers working in chp at stpp, jaipur, mancherial, telangana.
Read moreTggenco-ytps(5x800mw)-supply of bearings with adaptor sleeves required for crusher model of 1219u for crushers of chp/ytps.
Tggenco-ytps(5x800mw)-supply of bearings with adaptor sleeves required for crusher model of 1219u for crushers of chp/ytps.
Read moreSupply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru
Read moreRewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27
Rewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27
Read moreKtps vii stage-chp-annual service contract to be carried out by m/s cummins authorized dealer for cummins make engines model nta-855-l of bhel locomotives and vta 28 l of ventra locomotive as and when required during the year 2026-27.
Ktps vii stage-chp-annual service contract to be carried out by m/s cummins authorized dealer for cummins make engines model nta-855-l of bhel locomotives and vta 28 l of ventra locomotive as and when required during the year 2026-27.
Read moreof your Industry type