Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Erection Of 12.64 Km 33 Kv Line In Aii Divisions Of Kamareddy Circle
|
| Description |
Erection Of 12.64 Km 33 Kv Lines In All Operation Divisions Of Kamareddy Circle On Partial Turnkey Basis.
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 518940 |
|
Reference Number |
I-102/2024-25/TGNPDCL/CGM(PROJ)/KMR |
| Tender Fee | 2048 |
| EMD | 1.16 Lakh |
| Tender Value | |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | June 14, 2024 01:30 |
| End Date |
Expired
26/06/2024
Expired 736 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
A)extension of overhead line through ab cable for illumination purpose b)installation of distribution transformer c)erection of 3.3kv ohl for installed of 315kva transformer d)renovation and erection of 440 volt head line of sarubera colliery .
A)extension of overhead line through ab cable for illumination purpose b)installation of distribution transformer c)erection of 3.3kv ohl for installed of 315kva transformer d)renovation and erection of 440 volt head line at sarubera colliery.
Read moreErection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrrangement at topa ocp under kuju area.
Erection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrangement at topa ocp under kuju area.
Read moreStrengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreSupply, fabrication and erection of balance ss piping and valves in block 103 and 114 of project inrpc, nrb tarapur.
Supply, fabrication and erection of balance ss piping and valves in block 103 and 114 of project inrpc, nrb tarapur.
Read moreImprovement of passage and drainage line in beat no 213 in e ward.
Improvement of passage and drainage line in beat no 213 in e ward.
Read moreRestoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.
Restoration of landslide affected sections from km 12.800 to km 14.220 of nh-58e (kundal-jhadol section) in the state of rajasthan.
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreEngagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Read moreReplacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Replacement and upgradation of existing sewer line with upvc pipes in basement of pd area at millennium city centre gurugram metro station of line-2 south (six months).
Read moreof your Industry type