Tender Details

Particulars Details
Title
Maintenance Of Tarighat Bara Road Of Nh 124 C From Km 0.000 To Km 38.600 In Total 38.600 Km Length Under Performance Based Maintenance Contract In The State Of Uttar Pradesh.
Description
Maintenance Of Tarighat Bara Road Of Nh 124 C From Km 0.000 To Km 38.600 In Total 38.600 Km Length Under Performance Based Maintenance Contract In The State Of Uttar Pradesh.
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2024_MoRTH_834836_1
Reference
Number
7424/ 205 Com.B-NHCP/24 , Dated 08.11.2024
Tender Fee 10000
EMD 35.33 Lakh
Tender Value
Place GHAZIPUR
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=877334

Start Date November 15, 2024 14:30
End Date
Expired 14/12/2024

Expired 563 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.

Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based&#x0d maintenance contract in the state of uttar pradesh.

Read more
Engagement of user fee agency through e-quotation for shahbpur fee plaza at km 5.925 for the section from km.0.000 to km. 43.000(barabanki-jarwal section) of nh-28c in the state of uttar-pradesh

Engagement of user fee agency through e-quotation for shahbpur fee plaza at km 5.925 for the section from km.0.000 to km. 43.000(barabanki-jarwal section) of nh-28c in the state of uttar-pradesh

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Supervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb

Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal

Read more
Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement

Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Short term maintenance of stretch from km. 0.00 to km. 30.000 (assam west bengal border to kachugaon section) as-12, nh-27 in the state of assam.

Short term maintenance of stretch from km. 0.00 to km. 30.000 (assam west bengal border to kachugaon section) as-12, nh-27 in the state of assam.

Read more
Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana

Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise