Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Resurfacing Works On Zojila Kargil Leh Road Between Km 120.00 To Km 157.00 Under 55 Rcc/ 762 Brtf Project Vijayak In The Union Territory Of Ladakh
|
Description |
Resurfacing Works On Zojila Kargil Leh Road Between Km 120.00 To Km 157.00 Under 55 Rcc/ 762 Brtf Project Vijayak In The Union Territory Of Ladakh
|
Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 7.62 Lakh |
Tender Value | |
Place | KM 120.00 TO 157.00 UNDER 55 RCC 762 TF |
Link |
AAAAAAAAAA Login to view |
Start Date | July 12, 2025 19:30 |
End Date |
19/07/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreRepairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreSurf wk with gsb 15 cm, sand blanketing, wmm 75 mm, wmm 100 mm dbm 50 mm and bc 30 mm thick, prime and tack coat, earthen shoulders and rd marking bet km 0.00 to km 14.457 on rd tang-s/chingnyu under 100 rcc/15 brtf under (p) sewak in nagaland state
Surf wk with gsb 15 cm, sand blanketing, wmm 75 mm, wmm 100 mm dbm 50 mm and bc 30 mm thick, prime and tack coat, earthen shoulders and rd marking bet km 0.00 to km 14.457 on rd tang-s/chingnyu under 100 rcc/15 brtf under (p) sewak in nagaland state
Read moreConstruction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Read moreLink road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram (2nd call)
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000
Read moreProviding and laying of precast interlocking concrete blocks including wmm layers between km 59.000 to km 69.970 on road drass-umbala-sanku under 55 rcc/ 762 brtf project vijayak in the union territory of ladakh
Providing and laying of precast interlocking concrete blocks including wmm layers between km 59.000 to km 69.970 on road drass-umbala-sanku under 55 rcc/ 762 brtf project vijayak in the union territory of ladakh
Read moreConstruction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode
Construction of road from wangti (chenloisio) zero point to ib junction (bp 151) from km 0.00 to km 11.00 to nhsl specifications under 100/15 brtf/(p) sewak in nagaland state under epc mode
Read moreSs of c/sand (dry) for pmt wks of constr/ imprvt of rd hangu- chor ii to nhsl (ps) spfcn from km 0.00 to km 4.00 through dept exec mode under 130 rcc/ 764 brtf (p) swtk in the state of sikkim, job no. 307/04
Ss of c/sand (dry) for pmt wks of constr/ imprvt of rd hangu- chor ii to nhsl (ps) spfcn from km 0.00 to km 4.00 through dept exec mode under 130 rcc/ 764 brtf (p) swtk in the state of sikkim, job no. 307/04
Read moreConstruction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a
Read moreof your Industry type