Tender Details

Particulars Details
Title
Resurfacing Works On Zojila Kargil Leh In Between Km 224.652 To Km 268.00 Under 55 Rcc/ 762 Brtf Project Vijayak In The Union Territory Of Ladakh
Description
Resurfacing Works On Zojila Kargil Leh In Between Km 224.652 To Km 268.00 Under 55 Rcc/ 762 Brtf Project Vijayak In The Union Territory Of Ladakh
Organisation Dte General Border Roads Organisation | Central Govt. Ministry/Department
Tender Id 2025_BRO_692207_1
Reference
Number
CE(P) VJK/26/2024-25
Tender Fee 0
EMD 6.53 Lakh
Tender Value
Place Bet Km 224.652 to Km 268
Link https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=774939
Start Date January 28, 2025 15:30
End Date

05/02/2025 ( Expired 128 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)

Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)

Read more
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Read more
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)

Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise