Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services As Authority Engineer During Operation And Maintenance For Four Lanning Of Hassan Existing Km 189.700, Design Ch 184.912 To Maranahally Existing Km 237.000, Design Ch 230.060 Section Of Nh75 Under Epc Mode In The State Of Karnata
|
| Description |
Consultancy Services As Authority Engineer During Operation And Maintenance For Four Lanning Of Hassan Existing Km 189.700, Design Ch 184.912 To Maranahally Existing Km 237.000, Design Ch 230.060 Section Of Nh75 Under Epc Mode In The State Of Karnata
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_225562_1 |
|
Reference Number |
NIT No.36/NHAI/RO-BNG/AE OM/Tender/ |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | - |
| Place | NHAI-RO-Bangalore |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=252629 |
| Start Date | February 04, 2025 17:30 |
| End Date |
Expired
04/03/2025
Expired 589 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
Read moreWidening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Read moreCs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Cs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Read moreConstruction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Construction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Read moreSlope protection work in ghat section from km 219.280 to 226.750 of four laning of hassan maranahalli section of nh48 new nh75 from km. 189.700 to km.237.000 in the state of karnataka on epc mode
Slope protection work in ghat section from km 219.280 to 226.750 of four laning of hassan maranahalli section of nh48 new nh75 from km. 189.700 to km.237.000 in the state of karnataka on epc mode
Read moreSlope protection works for the location at km 227.7 to 228.5 of four laning of hassan marnahalli section of nh48 new nh75 from km. 189.700 to km.237.000 in the state of karnataka on epc mode
Slope protection works for the location at km 227.7 to 228.5 of four laning of hassan marnahalli section of nh48 new nh75 from km. 189.700 to km.237.000 in the state of karnataka on epc mode
Read moreConsultancy services for widening and improvement of existing 2 lane to 4 lane configuration from maranahally km.236.000 to addahole km.261.810 of nh75 shiradi ghat
Consultancy services for widening and improvement of existing 2 lane to 4 lane configuration from maranahally km.236.000 to addahole km.261.810 of nh75 shiradi ghat
Read moreChain link fencing work jhansi khajuraho section of nh75 76 from design ch. km 76.6 existing ch. 82.100 near vill. chhatipahari to design ch. km. 161.7 existing ch. km. 57.9 near bamitha town in the state of up and mp under nhdp phaseiii on ham pkgii
Chain link fencing work jhansi khajuraho section of nh75 76 from design ch. km 76.6 existing ch. 82.100 near vill. chhatipahari to design ch. km. 161.7 existing ch. km. 57.9 near bamitha town in the state of up and mp under nhdp phaseiii on ham pkg i
Read moreIe services during om period for the project of four laning of harda to temagav section from design ch. 0.000 existing ch. 141.750 to design ch. 30.000 existing ch. 180.500 and chicholi existing ch. km 235.800 design ch km 81.000 to betul existing ch
Ie services during om period for the project of four laning of harda to temagav section from design ch. 0.000 existing ch. 141.750 to design ch. 30.000 existing ch. 180.500 and chicholi existing ch. km 235.800 design ch km 81.000 to betul existing
Read moreNhai has been assigned the work of consultancy services for widening and improvement of existing 2 lane to 4 lane configuration from maranahally km.236/000 to addahole km.261.810 of nh75 shiradi ghat 2nd call
Nhai has been assigned the work of consultancy services for widening and improvement of existing 2 lane to 4 lane configuration from maranahally km.236/000 to addahole km.261.810 of nh75 shiradi ghat 2nd call
Read moreof your Industry type