Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ie Services During Om Period For The Project Of Four Laning Of Harda To Temagav Section From Design Ch. 0.000 Existing Ch. 141.750 To Design Ch. 30.000 Existing Ch. 180.500 And Chicholi Existing Ch. Km 235.800 Design Ch Km 81.000 To Betul Existing Ch
|
| Description |
Ie Services During Om Period For The Project Of Four Laning Of Harda To Temagav Section From Design Ch. 0.000 Existing Ch. 141.750 To Design Ch. 30.000 Existing Ch. 180.500 And Chicholi Existing Ch. Km 235.800 Design Ch Km 81.000 To Betul Existing
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_228336_1 |
|
Reference Number |
NHAI/ROBPL/Harda/IE/NH47/2025/ |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | - |
| Place | NHAI RO Bhopal |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=256675 |
| Start Date | February 28, 2025 18:30 |
| End Date |
Expired
22/04/2025
Expired 540 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreSix-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Read moreUpgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Upgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Read moreMetal beam crash barrier mbcb work for four laning of dhangaon to boregaon section of nh347bg and nh753l from km 81.000 to 139.000 design length 58 km under bharatmala pariyojana in the state of madhya pradesh on hybrid annuity mode
Metal beam crash barrier mbcb work for four laning of dhangaon to boregaon section of nh347bg and nh753l from km 81.000 to 139.000 design length 58 km under bharatmala pariyojana in the state of madhya pradesh on hybrid annuity mode
Read moreConsultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read moreWidening of existing 2 laning stretch road in available width for safety drainage segregation of traffic in phaltan city start ch. 138 250 at bypass start point to end ch. 144 425 and construction new rob at km 179 730 existing km 61 100 of nh 965
Widening of existing 2 laning stretch road in available width for safety drainage segregation of traffic in phaltan city start ch. 138 250 at bypass start point to end ch. 144 425 and construction new rob at km 179 730 existing km 61 100 of nh 965
Read more4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
4l of jagtial karimnagar section of nh 563 from jagtial bypass start at design ch.0.000 existing chainage 90.500 on nh63 to design ch.58.866 km near sh-1 ch. 170.400 km at karimnagar bypass end dl 58.866 km in the state of telangana on dbfot mode
Read moreWidening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Read moreCs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Cs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Read moreConstruction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Construction of four-lane access control arwal bypass from km 54.200 to km 66.500 (design ch. 67.680) of existing nh-139 on naubatpur- hariharganj road in the state of bihar under epc mode.
Read moreof your Industry type