Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Slope Protection Works For The Location At Km 227.7 To 228.5 Of Four Laning Of Hassan Marnahalli Section Of Nh48 New Nh75 From Km. 189.700 To Km.237.000 In The State Of Karnataka On Epc Mode
|
| Description |
Slope Protection Works For The Location At Km 227.7 To 228.5 Of Four Laning Of Hassan Marnahalli Section Of Nh48 New Nh75 From Km. 189.700 To Km.237.000 In The State Of Karnataka On Epc Mode
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_232106_1 |
|
Reference Number |
02/NHAI/RO-BNG/Safety works/Tender/2025-26 dated 04.04.2025 |
| Tender Fee | 10000 |
| EMD | 28.55 Lakh |
| Tender Value | - |
| Place | NHAI-RO-Bangalore |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=262182 |
| Start Date | April 05, 2025 00:10 |
| End Date |
Expired
25/04/2025
Expired 536 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Six laning of atkadih to gorhar section of nh 19 (old nh 2) from km 320.800 to km 326.160 in the state of jharkhand on epc mode
Six laning of atkadih to gorhar section of nh 19 (old nh 2) from km 320.800 to km 326.160 in the state of jharkhand on epc mode
Read moreUpgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Upgradation of existing highway to 4 laning standard from pachpadara bypass (ch. 95.780) to patau interchange (ch. 115.003) section of nh25 in the state of rajasthan on epc mode.
Read moreBalance work of six laning of kagal satara section of nh 48 (old nh 4) package i from km 592.500 to km 658.000 in the state of maharashtra to be executed on epc mode under bharatmala pariyojana
Balance work of six laning of kagal satara section of nh 48 (old nh 4) package i from km 592.500 to km 658.000 in the state of maharashtra to be executed on epc mode under bharatmala pariyojana
Read moreSlope stabilisation and soil protection works at km 34.05 (teitrung bridge), km 27.900 (shonsho bridge), km 33.250 (mayung bridge) and km 84.575 (mokaha bridge) on road tuensang-mon under 100 rcc/ 15brtf (p) sewak in nagaland state under epc mode
Slope stabilisation and soil protection works at km 34.05 (teitrung bridge), km 27.900 (shonsho bridge), km 33.250 (mayung bridge) and km 84.575 (mokaha bridge) on road tuensang-mon under 100 rcc/ 15brtf (p) sewak in nagaland state under epc mode
Read moreSlope protection work in ghat section from km 219.280 to 226.750 of four laning of hassan maranahalli section of nh48 new nh75 from km. 189.700 to km.237.000 in the state of karnataka on epc mode
Slope protection work in ghat section from km 219.280 to 226.750 of four laning of hassan maranahalli section of nh48 new nh75 from km. 189.700 to km.237.000 in the state of karnataka on epc mode
Read moreConsultancy services as authority engineer during operation and maintenance for four lanning of hassan existing km 189.700, design ch 184.912 to maranahally existing km 237.000, design ch 230.060 section of nh75 under epc mode in the state of karnata
Consultancy services as authority engineer during operation and maintenance for four lanning of hassan existing km 189.700, design ch 184.912 to maranahally existing km 237.000, design ch 230.060 section of nh75 under epc mode in the state of karnata
Read moreRockfall and slope protection measures along mumbra by pass in thane district maharashtra on epc mode
Rockfall and slope protection measures along mumbra by pass in thane district maharashtra on epc mode
Read moreConstruction of lvup at noolvi cross at km 397.540 of six laning of hubli haveri section from km 340.000 to km 403.400 of nh48 old nh4 in the state of karnataka under standalone mode in the annual road safety plan under epc mode
Construction of lvup at noolvi cross at km 397.540 of six laning of hubli haveri section from km 340.000 to km 403.400 of nh48 old nh4 in the state of karnataka under standalone mode in the annual road safety plan under epc mode
Read moreAe for construction of additional structures including approaches in vadodara surat section of nh48 between existing km 108.000 to km 250.000 of nh48 on epc mode under nh(o) in the state of gujarat
Ae for construction of additional structures including approaches in vadodara surat section of nh48 between existing km 108.000 to km 250.000 of nh48 on epc mode under nh(o) in the state of gujarat
Read moreConstruction of vup talkere hand post ka 02 057, lvup agrahara junction ka 02 273 and vup tippasandra hand post ka 02 015 of morth identified black spots on devihalli hassan section of nh75 to be d on epc mode
Construction of vup talkere hand post ka 02 057, lvup agrahara junction ka 02 273 and vup tippasandra hand post ka 02 015 of morth identified black spots on devihalli hassan section of nh75 to be d on epc mode
Read moreof your Industry type