Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Slope Protection Work In Ghat Section From Km 219.280 To 226.750 Of Four Laning Of Hassan Maranahalli Section Of Nh48 New Nh75 From Km. 189.700 To Km.237.000 In The State Of Karnataka On Epc Mode
|
| Description |
Slope Protection Work In Ghat Section From Km 219.280 To 226.750 Of Four Laning Of Hassan Maranahalli Section Of Nh48 New Nh75 From Km. 189.700 To Km.237.000 In The State Of Karnataka On Epc Mode
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_232092_1 |
|
Reference Number |
01/NHAI/RO-BNG/Safety works/Tender/2025-26 |
| Tender Fee | 10000 |
| EMD | 13 Lakh |
| Tender Value | - |
| Place | NHAI-RO-Bangalore |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=262174 |
| Start Date | April 05, 2025 00:00 |
| End Date |
Expired
25/04/2025
Expired 537 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Slope protection works for the location at km 227.7 to 228.5 of four laning of hassan marnahalli section of nh48 new nh75 from km. 189.700 to km.237.000 in the state of karnataka on epc mode
Slope protection works for the location at km 227.7 to 228.5 of four laning of hassan marnahalli section of nh48 new nh75 from km. 189.700 to km.237.000 in the state of karnataka on epc mode
Read moreConsultancy services as authority engineer during operation and maintenance for four lanning of hassan existing km 189.700, design ch 184.912 to maranahally existing km 237.000, design ch 230.060 section of nh75 under epc mode in the state of karnata
Consultancy services as authority engineer during operation and maintenance for four lanning of hassan existing km 189.700, design ch 184.912 to maranahally existing km 237.000, design ch 230.060 section of nh75 under epc mode in the state of karnata
Read moreWidening and improvement of existing 2-lane to 4-lane from maranahalli (design km.236.000 existing km.237.000) to addahole (design km.261.810, existing km. 263.0.500) (shiradi ghat) of bangalore-mangalore section of nh-75 in karnataka on epc mode
Widening and improvement of existing 2-lane to 4-lane from maranahalli (design km.236.000 existing km.237.000) to addahole (design km.261.810, existing km. 263.0.500) (shiradi ghat) of bangalore-mangalore section of nh-75 in karnataka on epc mode
Read moreEngagement of user fee collection agency on the basis of eq through etender for chowlaggere fp at km. 193.020 for the use of four laning of hassan of nh48 in the state of karnataka (package i)
Engagement of user fee collection agency on the basis of eq through etender for chowlaggere fp at km. 193.020 for the use of four laning of hassan of nh48 in the state of karnataka (package i)
Read moreConsultancy services as independent engineer services during operation and maintenance stage of 4 laning of devihalli hassan section from km.110.00 to 189.500 of nh48 new nh no.75 excluding a new 2 lanes with paved shoulders bypass for channarayapat
Consultancy services as independent engineer services during operation and maintenance stage of 4 laning of devihalli hassan section from km.110.00 to 189.500 of nh48 new nh no.75 excluding a new 2 lanes with paved shoulders bypass for channarayapat
Read moreConstruction of vup talkere hand post ka 02 057, lvup agrahara junction ka 02 273 and vup tippasandra hand post ka 02 015 of morth identified black spots on devihalli hassan section of nh75 to be d on epc mode
Construction of vup talkere hand post ka 02 057, lvup agrahara junction ka 02 273 and vup tippasandra hand post ka 02 015 of morth identified black spots on devihalli hassan section of nh75 to be d on epc mode
Read moreConstruction of lvup at noolvi cross at km 397.540 of six laning of hubli haveri section from km 340.000 to km 403.400 of nh48 old nh4 in the state of karnataka under standalone mode in the annual road safety plan under epc mode
Construction of lvup at noolvi cross at km 397.540 of six laning of hubli haveri section from km 340.000 to km 403.400 of nh48 old nh4 in the state of karnataka under standalone mode in the annual road safety plan under epc mode
Read moreCs for sc for o and m of 4 laning of takoli kullu sec of nh 3 from 242.0 to 272.0 including ae services for slope stability/erosion control/landslide correction measures at various sec on takoli kullu sec of nh 3 from 262.0 to 65.0 hp on epc mode hp
Cs for sc for o and m of 4 laning of takoli kullu sec of nh 3 from 242.0 to 272.0 including ae services for slope stability/erosion control/landslide correction measures at various sec on takoli kullu sec of nh 3 from 262.0 to 265.0 hp on epc mode hp
Read moreof your Industry type