Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Resurfacing Works On Kargil Dumgil Road In Between Km 25.00 To Km 35.125 (Part I) And Batalik Chulichang Road In Between Km 0.00 To Km 3.060 (Part Ii) Under 55 Rcc/ 762 Brtf Project Vijayak In The Union Territory Of Ladakh
|
Description |
Resurfacing Works On Kargil Dumgil Road In Between Km 25.00 To Km 35.125 (Part I) And Batalik Chulichang Road In Between Km 0.00 To Km 3.060 (Part Ii) Under 55 Rcc/ 762 Brtf Project Vijayak In The Union Territory Of Ladakh
|
Organisation | Dte General Border Roads Organisation | Central Govt. Ministry/Department |
Tender Id | 2024_BRO_638343_1 |
Reference Number |
CE (P) Vijayak/33/2023-24 |
Tender Fee | 0 |
EMD | 1.84 Lakh |
Tender Value | |
Place | bt km25-35.125 on k-d bt km0-km3.06 on b-c |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=714596 |
Start Date | January 25, 2024 15:30 |
End Date |
15/02/2024 ( Expired 495 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode
Read moreConstr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Constr of new rd nelya dhaula (pkg/02) to nhsl specifications from km 12.00 to km 41.691 with link rd 0.00 to 2.775 (bhawani post) (net length 32.467 km) in the state of arunachal pradesh under 127 rcc/ 42 brtf project vartak (gs icbr ii)
Read moreConstruction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreP/l bc 30 mm incl correction wks with bm 50 mm and thermoplastic paint for edge marking bet km 7.00 to km 40.06 (waste shredded plastic to be used for 3.63 km length) on road mon-lungwa under 100 rcc/15 brtf sector (p) sewak in nagaland state
P/l bc 30 mm incl correction wks with bm 50 mm and thermoplastic paint for edge marking bet km 7.00 to km 40.06 (waste shredded plastic to be used for 3.63 km length) on road mon-lungwa under 100 rcc/15 brtf sector (p) sewak in nagaland state
Read moreSupply and stacking of precast rcc culverts between km 95.00 and km 108.00 on leh-chalunka road under 54 rcc/16 brtf project vijayak in the uniion teritory of ladakh (tender no. cdr 16 brtf/02/2025-26)
Supply and stacking of precast rcc culverts between km 95.00 and km 108.00 on leh-chalunka road under 54 rcc/16 brtf project vijayak in the uniion teritory of ladakh (tender no. cdr 16 brtf/02/2025-26)
Read moreHandling and/or conveyance of cement and other stores from hq 1022 (i) espl (leh) to various detachments under 54 rcc/16 brtf under project vijayak in the union territory of ladakh
Handling and/or conveyance of cement and other stores from hq 1022 (i) espl (leh) to various detachments under 54 rcc/16 brtf under project vijayak in the union territory of ladakh
Read moreProviding, laying, bm 50 mm, bc 30 mm thick (hmp mix), applying tack coat and road marking all as per morth specifications between km 0.00 to 21.630 on mariani dessai road under 103 rcc /752 brtf/project udayak in assam/ nagaland state
Providing, laying, bm 50 mm, bc 30 mm thick (hmp mix), applying tack coat and road marking all as per morth specifications between km 0.00 to 21.630 on mariani dessai road under 103 rcc /752 brtf/project udayak in assam/ nagaland state
Read moreImprovement of road by pdg. stg. on bye -pass from sirsa ellenabad road to hanumangarh tibbi road km 0.00 to 3.90 (road id 5909) in sirsa distt in ellenabad constituency( work programme 2025-26) under head-5054 (group-i)(without gst)
Improvement of road by pdg. stg. on bye -pass from sirsa ellenabad road to hanumangarh tibbi road km 0.00 to 3.90 (road id 5909) in sirsa distt in ellenabad constituency( work programme 2025-26) under head-5054 (group-i)(without gst)
Read moreDesign and construction including ssi, proof checking from iit for 55 mtr span psc box girder bridge excluding approaches over gagrian nallah at km 0.300 on road gali-anganpathri under 79 rcc/31 brtf project sampark in jk ut 2nd call
Design and construction including ssi, proof checking from iit for 55 mtr span psc box girder bridge excluding approaches over gagrian nallah at km 0.300 on road gali-anganpathri under 79 rcc/31 brtf project sampark in jk ut 2nd call
Read moreSurf wks bet km km 62.220 and km 67.700 under part a and surf wks bet km 15.265 and km 15.525 and km 18.200 under part b on road reasi-arnas-mahore of 110 rcc/31 brtf under project spk in j and k (ut) 2nd call
Surf wks bet km km 62.220 and km 67.700 under part a and surf wks bet km 15.265 and km 15.525 and km 18.200 under part b on road reasi-arnas-mahore of 110 rcc/31 brtf under project spk in j and k (ut) 2nd call
Read moreof your Industry type