Tender Details

Particulars Details
Title
Cutting, Jointing And Laying 8 Inch Dia G.I. Pipeline Required For Diversion Of The Existing Dilevery Side Pipeline Of The 2000 G.P.M. Pump Motor Set Involved In Supplying Water To The Village Pond, Owing To Development Of The O.B. Dump, W.R.T. Karo
Description
Cutting, Jointing And Laying 8 Inch Dia G.I. Pipeline Required For Diversion Of The Existing Dilevery Side Pipeline Of The 2000 G.P.M. Pump Motor Set Involved In Supplying Water To The Village Pond, Owing To Development Of The O.B. Dump, W.R.T. Karo
Organisation Coal India Limited (CIL)
Tender Id 2023_CCL_294806_1
Reference
Number
P.E. (EnM)/ Karo OCP/ e-tender/ 23-24/ 33
Tender Fee -
EMD 3800
Tender Value -
Place Office of the P.O. (Karo OCP),
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date November 30, 2023 17:15
End Date
Expired 09/12/2023

Expired 1039 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Cutting, jointing and laying of 8 inch dia g.i. pipeline required for di of the delivery side pipeline of the 2000 g.p.m. pump motor set installed in mine, involved in supplying water to the village pond, owing to haul road development, w.r.t.

Cutting, jointing and laying of 8 inch dia g.i. pipeline required for di of the delivery side pipeline of the 2000 g.p.m. pump motor set installed in mine, involved in supplying water to the village pond, owing to haul road development, w.r.t.

Read more
Dismantling and diversion cum erection of 220 v lighting oh lines along the nallah road, owing to development of the public road through diverted route w.r.t. karo ocp, under bnk area.

Dismantling and diversion cum erection of 220 v lighting oh lines along the nallah road, owing to development of the public road through diverted route w.r.t. karo ocp, under bnk area.

Read more
Dismantling and laying of 8 inch dia m.s. pipeline required for di of the delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area.

Dismantling and laying of 8 inch dia m.s. pipeline required for di of the delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area.

Read more
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area

Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area&#x0d

Read more
Cutting, jointing and laying 8 inch dia g.i. pipeline required for lowering of the 2000 g.p.m. pump motor set involved in supplying water to the village pond, two times in a period of one month, w.r.t. karo ocp, bnk area

Cutting, jointing and laying 8 inch dia g.i. pipeline required for lowering of the 2000 g.p.m. pump motor set involved in supplying water to the village pond, two times in a period of one month, w.r.t. karo ocp, bnk area

Read more
Dismantling, re arrangement cum erection of 220 v lighting oh lines at patch a, needed for proper lighting of the pump location, owing to change in the position of the 2000 g.p.m. pump set in patch a, w.r.t. karo ocp, under bnk area.

Dismantling, re arrangement cum erection of 220 v lighting oh lines at patch a, needed for proper lighting of the pump location, owing to change in the position of the 2000 g.p.m. pump set in patch a, w.r.t. karo ocp, under bnk area.

Read more
Repairing of the 8 inch dia pvc suction pipeline and its accessories of the 2000 g.p.m. pump set, in operation at the a patch, in mine w.r.t. karo ocp, under bnk area

Repairing of the 8 inch dia pvc suction pipeline and its accessories of the 2000 g.p.m. pump set, in operation at the a patch, in mine w.r.t. karo ocp, under bnk area

Read more
Dismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the 2000 g.p.m. pump motor set, in mine, supplying water to the village pond, w.r.t. karo ocp, under bnk area

Dismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the 2000 g.p.m. pump motor set, in mine, supplying water to the village pond, w.r.t. karo ocp, under bnk area

Read more
Making of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area

Making of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area

Read more
Making of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area

Making of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise