Tender Details
Particulars | Details |
---|---|
Title |
Dismantling, Re Arrangement Cum Erection Of 220 V Lighting Oh Lines At Patch A, Needed For Proper Lighting Of The Pump Location, Owing To Change In The Position Of The 2000 G.P.M. Pump Set In Patch A, W.R.T. Karo Ocp, Under Bn K Area.
|
Description |
Dismantling, Re Arrangement Cum Erection Of 220 V Lighting Oh Lines At Patch A, Needed For Proper Lighting Of The Pump Location, Owing To Change In The Position Of The 2000 G.P.M. Pump Set In Patch A, W.R.T. Karo Ocp, Under Bn K Area.
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_CCL_294808_1 |
Reference Number |
P.E. (EnM)/ Karo OCP/ e-tender/ 23-24/ 34 |
Tender Fee | |
EMD | 1500 |
Tender Value | |
Place | Office of the P.O. (Karo OCP), |
Link | https://coalindiatenders.nic.in |
Start Date | November 30, 2023 17:15 |
End Date |
09/12/2023 ( Expired 548 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Di cum erection of a portion of the 3.3 kv oh feeder to karo basti, w.r.t. karo ocp, under bnk area.
Di cum erection of a portion of the 3.3 kv oh feeder to karo basti, w.r.t. karo ocp, under bnk area. 
Read moreDismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area
Dismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area
Read moreDismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Read moreMaking of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area
Making of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area
Read moreMaintenance and erection and dismantling of 440/220 volt lighting overhead (oh) line before monsoon for proper maintenance of critical location lt overhead lines under tetariakhar ocp, rajhara area.
Maintenance and erection and dismantling of 440/220 volt lighting overhead (oh) line before monsoon for proper maintenance of critical location lt overhead lines under tetariakhar ocp, rajhara area.
Read moreDismantling and di cum laying of 8 inch dia m.s. pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk area
Dismantling and di cum laying of 8 inch dia m.s. pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk area
Read moreExtension cum erection of 220 v oh electric oh line for lighting of the h patch pump location in mine, w.r.t. karo ocp, under bnk area
Extension cum erection of 220 v oh electric oh line for lighting of the h patch pump location in mine, w.r.t. karo ocp, under bnk area
Read moreMaking of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area
Making of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area
Read moreDismantling and erection of 220 v oh electric oh line for lighting of the a patch pump location, in mine, w.r.t. karo ocp, under bnk area.
Dismantling and erection of 220 v oh electric oh line for lighting of the a patch pump location, in mine, w.r.t. karo ocp, under bnk area.
Read moreDismantling and di cum erection of the 3.3 kv oh line for feeding power to the new proposed location of the 2000 g.p.m. pump motor at the h patch, in mine, w.r.t. karo ocp, under bnk area
Dismantling and di cum erection of the 3.3 kv oh line for feeding power to the new proposed location of the 2000 g.p.m. pump motor at the h patch, in mine, w.r.t. karo ocp, under bnk area
Read moreof your Industry type