Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Re Arrangement Cum Erection Of 220 V Lighting Oh Lines At Patch A, Needed For Proper Lighting Of The Pump Location, Owing To Change In The Position Of The 2000 G.P.M. Pump Set In Patch A, W.R.T. Karo Ocp, Under Bn K Area.
|
| Description |
Dismantling, Re Arrangement Cum Erection Of 220 V Lighting Oh Lines At Patch A, Needed For Proper Lighting Of The Pump Location, Owing To Change In The Position Of The 2000 G.P.M. Pump Set In Patch A, W.R.T. Karo Ocp, Under Bn K Area.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_294808_1 |
|
Reference Number |
P.E. (EnM)/ Karo OCP/ e-tender/ 23-24/ 34 |
| Tender Fee | - |
| EMD | 1500 |
| Tender Value | - |
| Place | Office of the P.O. (Karo OCP), |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 30, 2023 17:15 |
| End Date |
Expired
09/12/2023
Expired 998 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Lowering of the two nos. of 2000 g.p.m. pump motor sets, installed at the a patch, two times in a period of one month, w.r.t. karo ocp, bnk area.
Lowering of the two nos. of 2000 g.p.m. pump motor sets, installed at the a patch, two times in a period of one month, w.r.t. karo ocp, bnk area.
Read moreMaking pump foundations and laying of 3.3 kv cable required for installation of two nos. of 2000 g.p.m. pump motor sets, at the a patch, w.r.t. karo ocp, under bnk area
Making pump foundations and laying of 3.3 kv cable required for installation of two nos. of 2000 g.p.m. pump motor sets, at the a patch, w.r.t. karo ocp, under bnk area
Read moreRepairing of the 8 inch dia pvc suction pipeline and its accessories of the 2000 g.p.m. pump set, in operation at the a patch, in mine w.r.t. karo ocp, under bnk area
Repairing of the 8 inch dia pvc suction pipeline and its accessories of the 2000 g.p.m. pump set, in operation at the a patch, in mine w.r.t. karo ocp, under bnk area
Read moreExtension, di cum re organisation of the 220 v oh line needed for proper illumination of the approach road and the h patch pump location w.r.t. karo o.c.p. under bnk area
Extension, di cum re organisation of the 220 v oh line needed for proper illumination of the approach road and the h patch pump location w.r.t. karo o.c.p. under bnk area
Read moreDismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the 2000 g.p.m. pump motor set, in mine, supplying water to the village pond, w.r.t. karo ocp, under bnk area
Dismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the 2000 g.p.m. pump motor set, in mine, supplying water to the village pond, w.r.t. karo ocp, under bnk area
Read moreDismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine for developement of haul road w.r.t. karo ocp, under bnk area
Dismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine for developement of haul road w.r.t. karo ocp, under bnk area
Read moreMaking of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area
Making of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area
Read moreMaking of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area
Making of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area
Read moreExtension cum erection of 220 v oh electric oh line for lighting of the h patch pump location in mine, w.r.t. karo ocp, under bnk area
Extension cum erection of 220 v oh electric oh line for lighting of the h patch pump location in mine, w.r.t. karo ocp, under bnk area
Read moreDismantling and erection of 220 v oh electric oh line for lighting of the a patch pump location, in mine, w.r.t. karo ocp, under bnk area.
Dismantling and erection of 220 v oh electric oh line for lighting of the a patch pump location, in mine, w.r.t. karo ocp, under bnk area.
Read moreof your Industry type