Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Making Pump Foundations And Laying Of 3.3 K V Cable Required For Installation Of Two Nos. Of 2000 G.P.M. Pump Motor Sets, At The A Patch, W.R.T. Karo Ocp, Under Bn K Area
|
Description |
Making Pump Foundations And Laying Of 3.3 K V Cable Required For Installation Of Two Nos. Of 2000 G.P.M. Pump Motor Sets, At The A Patch, W.R.T. Karo Ocp, Under Bn K Area
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_333445_1 |
Reference Number |
P.E. (EnM)/ Karo OCP/ e-tender/ 2024-25/ 126 |
Tender Fee | 0 |
EMD | 3100 |
Tender Value | |
Place | KARO OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345650 |
Start Date | March 28, 2025 17:25 |
End Date |
07/04/2025 ( Expired 82 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of covered cable trence with laying and installation of 350 mtr long, 5 nos 11 kv 3-phase 3 core120 sq mm xlpe underground cable in a covered cable trence from newly constructed 33 11 kv durgachowmuhani ss under ed kamalpur
Construction of covered cable trence with laying and installation of 350 mtr long, 5 nos 11 kv 3-phase 3 core120 sq mm xlpe underground cable in a covered cable trence from newly constructed 33 11 kv durgachowmuhani ss under ed kamalpur
Read morePart repairing, overhauling and maintenance work of the tata make departmental truck bearing no. br20g0880, w.r.t. karo ocp, under bnk area
Part repairing, overhauling and maintenance work of the tata make departmental truck bearing no. br20g0880, w.r.t. karo ocp, under bnk area
Read moreCleaning, painting and repairing of 6900 nos. of 20 kg c.i. test weights for use in road weighbridges of karo ocp, under bnk area
Cleaning, painting and repairing of 6900 nos. of 20 kg c.i. test weights for use in road weighbridges of karo ocp, under bnk area
Read moreOnsite repairing of two nos. ocb switches, first 3.3 kv, 400 a, sr. no. 82 by 216, reyrolle burn make and second 11 kv, 400 a, sr. no. 82 by 59, reyrolle burn make at karo ocp, bnk area
Onsite repairing of two nos. ocb switches, first 3.3 kv, 400 a, sr. no. 82 by 216, reyrolle burn make and second 11 kv, 400 a, sr. no. 82 by 59, reyrolle burn make at karo ocp, bnk area
Read moreRepair cum maintenance of the 3.3 kv and 11 kv gang operated a.b. switches, including its accessories for its installation, installed in mine, workshop and the 11 kv main substation, under karo ocp, bnk area
Repair cum maintenance of the 3.3 kv and 11 kv gang operated a.b. switches, including its accessories for its installation, installed in mine, workshop and the 11 kv main substation, under karo ocp, bnk area
Read moreOnsite oil filtration of all the distribution and the power transformers under karo ocp, w.r.t. karo ocp, under bnk area
Onsite oil filtration of all the distribution and the power transformers under karo ocp, w.r.t. karo ocp, under bnk area
Read moreOnsite repair and prive maintenance of two nos. of high mast lighting tower and repair, maintenance, and erection of the 500 w and 300 w l.e.d. flood lights installed at the different location of the mine under karo ocp, bnk area.
Onsite repair and prive maintenance of two nos. of high mast lighting tower and repair, maintenance, and erection of the 500 w and 300 w l.e.d. flood lights installed at the different location of the mine under karo ocp, bnk area.
Read moreRepairing cum girder changing of two nos. of road weighbridges, i.e. wb. no. 5 and wb. no. 1, under karo ocp, bnk area.
Repairing cum girder changing of two nos. of road weighbridges, i.e. wb. no. 5 and wb. no. 1, under karo ocp, bnk area.
Read more1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc
1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc
Read moreLaying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area
Laying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area
Read moreof your Industry type