Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Dismantling And Di Cum Erection Of The 3.3 K V Oh Line For Feeding Power To The New Proposed Location Of The 2000 G.P.M. Pump Motor At The H Patch, In Mine, W.R.T. Karo Ocp, Under Bn K Area
|
Description |
Dismantling And Di Cum Erection Of The 3.3 K V Oh Line For Feeding Power To The New Proposed Location Of The 2000 G.P.M. Pump Motor At The H Patch, In Mine, W.R.T. Karo Ocp, Under Bn K Area
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_333447_1 |
Reference Number |
P.E. (EnM)/ Karo OCP/ e-tender/ 2024-25/ 128 |
Tender Fee | 0 |
EMD | 5000 |
Tender Value | |
Place | KARO OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345652 |
Start Date | March 28, 2025 17:25 |
End Date |
07/04/2025 ( Expired 80 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
(1) extention / diversion of 3.3 kv overhead line at ocp of akwmc.(2) diversion of 3.3 kv feeder to provide power to 7 seam to new location due to new bench exposed at akwmc,katras area-iv.(3) dismantling and diversion of 3.3 kv over head line for ma
(1) extention / diversion of 3.3 kv overhead line at ocp of akwmc.(2) diversion of 3.3 kv feeder to provide power to 7 seam to new location due to new bench exposed at akwmc,katras area-iv.(3) dismantling and diversion of 3.3 kv over head line for ma
Read more1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc
1) erection of 3.3 kv over head line installation of 3000 gpm pump at ampl sump for fire fighting of ampl coal dump akwmc,ocp katras area.(2) dismantling and diversion of 6.6 kv power feeder for placement of electrical drill at ocp of akwmc
Read moreExtension of 6.6kv o/h line (collection of pole with dismantling of pole from nocp)at basdeopur ocp(ii) for the erection of 6.6kv o/h line from hanuman bazar(near hiltop camp) to kankanee ocp patch b 13 seam,450 mtr.approx for the operation of pump
Extension of 6.6kv o/h line (collection of pole with dismantling of pole from nocp)at basdeopur ocp(ii) for the erection of 6.6kv o/h line from hanuman bazar(near hiltop camp) to kankanee ocp patch b 13 seam,450 mtr.approx for the operation of pump
Read moreDi of 11 kv overhead line of jbvnl in bingalt road side (new patch) including dismantling and erection of 11 kv overhead line at amrapali ocp, a-c area
Di of 11 kv overhead line of jbvnl in bingalt road side (new patch) including dismantling and erection of 11 kv overhead line at amrapali ocp, a-c area
Read moreDismantling /erection of pole with installation of stay, pin insulator and conductor of 11 kv o/h line of bahera for shifting of oh line in new vision village under chp-cpp/ppr.
Dismantling /erection of pole with installation of stay, pin insulator and conductor of 11 kv o/h line of bahera for shifting of oh line in new vision village under chp-cpp/ppr.
Read moreExtention / diversion of 3.3 kv overhead line at ocp of akwmc.(2) diversion of 3.3 kv feeder to provide power to 7 seam to new location due to new bench exposed at akwmc,katras area-iv.(3) dismantling and diversion
Extention / diversion 
 of 3.3 kv overhead line at 
 ocp of akwmc.(2) diversion 
 of 3.3 kv feeder to provide 
 power to 7 seam to new 
 location due to new 
 bench 
 exposed 
 at 
 akwmc,katras area-iv.(3) 
 dismantling and diversion
Read moreMaking of new pin and rubber bush coupling assembly with other accessories of the four nos. of 2000 g.p.m., 150 m head pump set, in operation at karo ocp, bnk area
Making of new pin and rubber bush coupling assembly with other accessories of the four nos. of 2000 g.p.m., 150 m head pump set, in operation at karo ocp, bnk area
Read moreConstruction of protective boundary through a portion of the pipeline of 2000 g.p.m. pump, in operation in mine, feeding water to the tanker point, by rail poles and work of channel, angle iron, under karo ocp, bnk area
Construction of protective boundary through a portion of the pipeline of 2000 g.p.m. pump, in operation in mine, feeding water to the tanker point, by rail poles and work of channel, angle iron, under karo ocp, bnk area
Read moreDismantling of the existing 220 v oh line conductor erected on the garters of the abondoned chp, and erection of 220 v oh line with erection of poles for proper lighting of the platform near the track, at krgali railway siding, w.r.t. karo ocp, under
Dismantling of the existing 220 v oh line conductor erected on the garters of the abondoned chp, and erection of 220 v oh line with erection of poles for proper lighting of the platform near the track, at krgali railway siding, w.r.t. karo ocp, under
Read moreComplete overhauling and repairing of 01 no. 2000 gpm pump, name plate missing, 3chr, make mnp and onsite commissioning of the pump on the base plate and alignment with the three phase induction motor in mine w.r.t. karo ocp, bnk area
Complete overhauling and repairing of 01 no. 2000 gpm pump, name plate missing, 3chr, make mnp and onsite commissioning of the pump on the base plate and alignment with the three phase induction motor in mine w.r.t. karo ocp, bnk area
Read moreof your Industry type