Di Cum Dismantling Of 3.3 Kv Oh Electric Line Feeding Power To The Pump Installed At The A Patch, W.R.T. Karo Ocp, Bn K Area
|
| Description |
Di Cum Dismantling Of 3.3 Kv Oh Electric Line Feeding Power To The Pump Installed At The A Patch, W.R.T. Karo Ocp, Bn K Area
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_343320_1 |
|
Reference Number |
P.E. (EnM)/ Karo OCP/ e-tender/ 2025-26/ 32 |
| Tender Fee | 0 |
| EMD | 11700 |
| Tender Value | - |
| Place | Karo OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=355882 |
| Start Date | September 06, 2025 14:30 |
| End Date |
Expired
15/09/2025
Expired 398 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Diversion cum erection of ht oh line passing thorough karo forest patch under bnk area
Diversion cum erection of ht oh line passing thorough karo forest patch under bnk area
Read moreFor dismantling of ocp substation shed of size 50 ft x 50 and dismantling shifting, loading unloading of 1.5mva,6.6kv/3.3kv, transformer of badeopur colliery under sijua area
For dismantling of ocp substation shed of size 50 ft x 50 and dismantling shifting, loading unloading of 1.5mva,6.6kv/3.3kv, transformer of badeopur colliery under sijua area
Read moreErection, dismantling, shifting and maintenance of 440v/220v overhead (oh) line on as and when required basis for a period of 365 days (1 year) under birsa ocp.
Erection, dismantling, shifting and maintenance of 440v/220v overhead (oh) line on as and when required basis for a period of 365 days (1 year) under birsa ocp.
Read more(a)day to day erection, extension, diversion and dismantling of 220v/440 v oh line at 06 no, departmental patch and weighbridge for providing lighting power for proper lighting for operation of shovel for a period of 365 days or till exhaustion of qu
(a)day to day erection, extension, diversion and dismantling of 220v/440 v oh line at 06 no, departmental patch and weighbridge for providing lighting power for proper lighting for operation of shovel for a period of 365 days or till exhaustion of qu
Read moreDismantling, di cum erection of 3.3 kv oh electric line, feeding power to the pump set, installed at the h patch, w.r.t. karo ocp, under bnk area.
Dismantling, di cum erection of 3.3 kv oh electric line, feeding power to the pump set, installed at the h patch, w.r.t. karo ocp, under bnk area.
Read moreDismantling and erection of 3.3 kv oh line for feeding power to the pump motor sets at the a patch, in mine, w.r.t. karo ocp, under bnk area
Dismantling and erection of 3.3 kv oh line for feeding power to the pump motor sets at the a patch, in mine, w.r.t. karo ocp, under bnk area
Read moreDi cum erection of a portion of the 3.3 kv oh feeder to karo basti, w.r.t. karo ocp, under bnk area.
Di cum erection of a portion of the 3.3 kv oh feeder to karo basti, w.r.t. karo ocp, under bnk area. 
Read moreDismantling a portion of the 3.3 kv oh electric line, near shiv mandir, feeding power to the 1000 gpm pump set in karo ocp mine, w.r.t. karo ocp, under bnk area.
Dismantling a portion of the 3.3 kv oh electric line, near shiv mandir, feeding power to the 1000 gpm pump set in karo ocp mine, w.r.t. karo ocp, under bnk area.
Read moreDismantling and di cum erection of 440 v oh electric oh line in the approach road leading to the a patch pump location, in mine, w.r.t. karo ocp, under bnk area
Dismantling and di cum erection of 440 v oh electric oh line in the approach road leading to the a patch pump location, in mine, w.r.t. karo ocp, under bnk area
Read moreDismantling and erection of 220 v oh electric oh line for lighting of the a patch pump location, in mine, w.r.t. karo ocp, under bnk area.
Dismantling and erection of 220 v oh electric oh line for lighting of the a patch pump location, in mine, w.r.t. karo ocp, under bnk area.