Tender Details

Particulars Details
Title
Lowering Of The Two Nos. Of 2000 G.P.M. Pump Motor Sets, Installed At The A Patch, Two Times In A Period Of One Month, W.R.T. Karo Ocp, Bn K Area.
Description
Lowering Of The Two Nos. Of 2000 G.P.M. Pump Motor Sets, Installed At The A Patch, Two Times In A Period Of One Month, W.R.T. Karo Ocp, Bn K Area.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_299707_1
Reference
Number
P.E. (EnM)/ Karo OCP/ e-tender/ 2023-24/ 61
Tender Fee 0
EMD 3600
Tender Value -
Place Karo OCP
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=310464

Start Date January 30, 2024 16:30
End Date
Expired 09/02/2024

Expired 937 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Maintenance of occupational health centre (ohc) at ytps for a period of two years and further extendable by one more year subject to satisfactory performance of the agency

Maintenance of occupational health centre (ohc) at ytps for a period of two years and further extendable by one more year subject to satisfactory performance of the agency

Read more
Door to door collection, segregation of municipal solid waste (msw) from each residential and commercial establishments & transportation to the transfer stations/processing site including manual road sweeping & desilting of all types of drains 3 times in a year in municipal corporation, madhubani for four (4) years

Door to door collection, segregation of municipal solid waste (msw) from each residential and commercial establishments & transportation to the transfer stations/processing site including manual road sweeping & desilting of all types of drains 3 times in a year in municipal corporation, madhubani for four (4) years

Read more
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Read more
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Read more
Cutting, jointing and laying 8 inch dia g.i. pipeline required for lowering of the 2000 g.p.m. pump motor set involved in supplying water to the village pond, two times in a period of one month, w.r.t. karo ocp, bnk area

Cutting, jointing and laying 8 inch dia g.i. pipeline required for lowering of the 2000 g.p.m. pump motor set involved in supplying water to the village pond, two times in a period of one month, w.r.t. karo ocp, bnk area

Read more
Onsite oil filtration of all the distribution and the power transformers under karo ocp, w.r.t. karo ocp, under bnk area

Onsite oil filtration of all the distribution and the power transformers under karo ocp, w.r.t. karo ocp, under bnk area

Read more
Making pump foundations and laying of 3.3 kv cable required for installation of two nos. of 2000 g.p.m. pump motor sets, at the a patch, w.r.t. karo ocp, under bnk area

Making pump foundations and laying of 3.3 kv cable required for installation of two nos. of 2000 g.p.m. pump motor sets, at the a patch, w.r.t. karo ocp, under bnk area

Read more
Di cum erection of a portion of the 3.3 kv oh feeder to karo basti, w.r.t. karo ocp, under bnk area.

Di cum erection of a portion of the 3.3 kv oh feeder to karo basti, w.r.t. karo ocp, under bnk area. &#x0d

Read more
Repairing of the internal electric wiring of the ccl quarters occupied by employees of karo ocp, w.r.t. karo ocp, under bnk area.

Repairing of the internal electric wiring of the ccl quarters occupied by employees of karo ocp, w.r.t. karo ocp, under bnk area.

Read more
Repairing of the internal electric wiring of the ccl quarters occupied by employees of karo ocp, w.r.t. karo ocp, under bnk area

Repairing of the internal electric wiring of the ccl quarters occupied by employees of karo ocp, w.r.t. karo ocp, under bnk area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise