Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling And Laying Of 8 Inch Dia M.S. Pipeline Required For Di Of The Delivery Pipeline Of The 2000 G.P.M. Pump Motor Set Installed At The A Patch In Mine, Involved In Dewatering Of The A Patch, W.R.T. Karo Ocp, Under Bn K Area.
|
| Description |
Dismantling And Laying Of 8 Inch Dia M.S. Pipeline Required For Di Of The Delivery Pipeline Of The 2000 G.P.M. Pump Motor Set Installed At The A Patch In Mine, Involved In Dewatering Of The A Patch, W.R.T. Karo Ocp, Under Bn K Area.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_318943_1 |
|
Reference Number |
P.E. (EnM)/ Karo OCP/ e-tender/ 2024-25/ 57 |
| Tender Fee | 0 |
| EMD | 2600 |
| Tender Value | - |
| Place | Karo OCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330591 |
| Start Date | October 10, 2024 16:30 |
| End Date |
Expired
18/10/2024
Expired 685 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Read moreRepairing of the 8 inch dia pvc suction pipeline and its accessories of the 2000 g.p.m. pump set, in operation at the a patch, in mine w.r.t. karo ocp, under bnk area
Repairing of the 8 inch dia pvc suction pipeline and its accessories of the 2000 g.p.m. pump set, in operation at the a patch, in mine w.r.t. karo ocp, under bnk area
Read moreLowering of the two nos. of 2000 g.p.m. pump motor sets, installed at the a patch, two times in a period of one month, w.r.t. karo ocp, bnk area.
Lowering of the two nos. of 2000 g.p.m. pump motor sets, installed at the a patch, two times in a period of one month, w.r.t. karo ocp, bnk area.
Read moreCutting, jointing and laying 8 inch dia g.i. pipeline required for lowering of the 2000 g.p.m. pump motor set involved in supplying water to the village pond, two times in a period of one month, w.r.t. karo ocp, bnk area
Cutting, jointing and laying 8 inch dia g.i. pipeline required for lowering of the 2000 g.p.m. pump motor set involved in supplying water to the village pond, two times in a period of one month, w.r.t. karo ocp, bnk area
Read moreDismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Dismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Read moreMaking pump foundations and laying of 3.3 kv cable required for installation of two nos. of 2000 g.p.m. pump motor sets, at the a patch, w.r.t. karo ocp, under bnk area
Making pump foundations and laying of 3.3 kv cable required for installation of two nos. of 2000 g.p.m. pump motor sets, at the a patch, w.r.t. karo ocp, under bnk area
Read moreDismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk a
Dismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk a
Read moreDismantling and di cum laying of 8 inch dia m.s. pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk area
Dismantling and di cum laying of 8 inch dia m.s. pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk area
Read moreDismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine for developement of haul road w.r.t. karo ocp, under bnk area
Dismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine for developement of haul road w.r.t. karo ocp, under bnk area
Read moreDi cum dismantling of 3.3kv oh electric line feeding power to the pump installed at the a patch, w.r.t. karo ocp, bnk area
Di cum dismantling of 3.3kv oh electric line feeding power to the pump installed at the a patch, w.r.t. karo ocp, bnk area
Read moreof your Industry type