Tender Details

Particulars Details
Title
Dismantling, Repairing And Laying Of The 8 Inch Dia M.S. Pipes Of The Delivery Pipeline Of The 2000 G.P.M. Pump Motor Set, In Operation At The H Patch In Mine, W.R.T. Karo Ocp, Under Bn K Area
Description
Dismantling, Repairing And Laying Of The 8 Inch Dia M.S. Pipes Of The Delivery Pipeline Of The 2000 G.P.M. Pump Motor Set, In Operation At The H Patch In Mine, W.R.T. Karo Ocp, Under Bn K Area
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_333444_1
Reference
Number
P.E. (EnM)/ Karo OCP/ e-tender/ 2024-25/ 125
Tender Fee 0
EMD 3200
Tender Value
Place KARO OCP
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345649
Start Date March 28, 2025 17:25
End Date

07/04/2025 ( Expired 77 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairing of pipe line used for supply of water from 6 pit bararee to 1 no. colony and bazar dhowra under bararee section total section of pipeline to be repaired damaged and worn out pipe is 120 mrt 4 inch dia m.s. pipe and changing/replace 4 in

Repairing of pipe line used for supply of water from 6 pit bararee to 1 no. colony and bazar dhowra under bararee section total section of pipeline to be repaired damaged and worn out pipe is 120 mrt 4 inch dia m.s. pipe and changing/replace 4 in

Read more
Laying pvc di 160 mm od pipeline 8 inch and 6 inch ms pipeline polder type pump along with pumping machinery at booster phase 10 and booster for flats infront of manav mangal school phase 10 to improve pressure in the area h no 891 to 1100 of phase 9

Laying pvc di 160 mm od pipeline 8 inch and 6 inch ms pipeline polder type pump along with pumping machinery at booster phase 10 and booster for flats infront of manav mangal school phase 10 to improve pressure in the area h no 891 to 1100 of phase 9

Read more
Extension of 6.6kv o/h line (collection of pole with dismantling of pole from nocp)at basdeopur ocp(ii) for the erection of 6.6kv o/h line from hanuman bazar(near hiltop camp) to kankanee ocp patch b 13 seam,450 mtr.approx for the operation of pump

Extension of 6.6kv o/h line (collection of pole with dismantling of pole from nocp)at basdeopur ocp(ii) for the erection of 6.6kv o/h line from hanuman bazar(near hiltop camp) to kankanee ocp patch b 13 seam,450 mtr.approx for the operation of pump

Read more
Di of pipeline 300 mtrs length, dia 6 inch (dismantling, transporting ,laying, jointing)at nichitpur ocp(ii) and installation of ms pipe 100mm 4 inch digging laying, jointing, refilling, welding etc

Di of pipeline 300 mtrs length, dia 6 inch (dismantling, transporting ,laying, jointing)at nichitpur ocp(ii) and installation of ms pipe 100mm 4 inch digging laying, jointing, refilling, welding etc

Read more
Laying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area

Laying, erection of 8 inch pipe range 450mtrs with pump-motor, base plate installation, tanker filling point fabrication and switch-er laying at block-iv ocp departmental patch under govindpur area

Read more
Making of delivery range casing for submersible pumps, removal of the old delivery range casing, fitting of submersible pump motor pipe complete set, ht turbine pump maintenance, delivery pipeline repairing in highwalls, suction, delivery pipeline wo

Making of delivery range casing for submersible pumps, removal of the old delivery range casing, fitting of submersible pump motor pipe complete set, ht turbine pump maintenance, delivery pipeline repairing in highwalls, suction, delivery pipeline wo

Read more
Work of 8 inch ms/gi pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine

Work of 8 inch ms/gi pipeline with dismantling, laying, pipe cutting, jointing etc work for pump shifting at coal face as well as 32 no. sump including repairing of old damaged delivery pipelines as when where req as per advancement of mine

Read more
Making of new pin and rubber bush coupling assembly with other accessories of the four nos. of 2000 g.p.m., 150 m head pump set, in operation at karo ocp, bnk area

Making of new pin and rubber bush coupling assembly with other accessories of the four nos. of 2000 g.p.m., 150 m head pump set, in operation at karo ocp, bnk area

Read more
Construction of protective boundary through a portion of the pipeline of 2000 g.p.m. pump, in operation in mine, feeding water to the tanker point, by rail poles and work of channel, angle iron, under karo ocp, bnk area

Construction of protective boundary through a portion of the pipeline of 2000 g.p.m. pump, in operation in mine, feeding water to the tanker point, by rail poles and work of channel, angle iron, under karo ocp, bnk area

Read more
Repairing of the transformer stands in mine and repairing of the tanker point at the pit office, w.r.t. karo ocp, under bnk area.

Repairing of the transformer stands in mine and repairing of the tanker point at the pit office, w.r.t. karo ocp, under bnk area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise