Tender Details
| Particulars | Details |
|---|---|
| Title |
Repair Cum Maintenance Of The 10 And 14 Inch Dia M.S. Pipeline In The Delivery Side Of 4000 G.P.M. Pump No. 1, In Operation At The Deep Mine Zone At R.O.C.P. Mine, W.R.T. R.O.C.P., Under Rajmahal Area.
|
| Description |
Repair Cum Maintenance Of The 10 And 14 Inch Dia M.S. Pipeline In The Delivery Side Of 4000 G.P.M. Pump No. 1, In Operation At The Deep Mine Zone At R.O.C.P. Mine, W.R.T. R.O.C.P., Under Rajmahal Area.
|
| Organisation | Eastern Coalfields Limited | ECL_Rajmahal area |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | 8400 |
| Tender Value | 6.7 Lakh |
| Place | Jharkhand |
| Link | Login to view |
| Start Date | November 03, 2026 22:30 |
| End Date |
Open
14/11/2026
10 days left |
Bidding on this tender?
Partners, bid preparation, supplier quotes and GeM registration, from our team and partners.
Can't bid on this alone?
Short of the turnover, experience or certification it asks for, or need a team where the work is? We'll find a JV, consortium or local partner.
Find a partner →Get tenders for your business
Tell us what you supply or do. We'll send you matching tenders and call you about them.
Free tender checklists for your industry →Similar Tenders
-
Re arrangement cum laying of 8 inch dia m.s. pipes, required for changing the path of the delivery range of the fire fighting pump, in operation at the intermediate sump in r.o.c.p. mine, w.r.t. r.o.c.p., under rajmahal area.
Eastern Coalfields Limited | ECL_Rajmahal area · Jharkhand Closed 13/10/2026
View tender -
Laying of 6 / 2 inch dia m.s./ g.i. pipes, for making arrangements for fire fighting at the coal stock near the deep mine zone, in the mine, w.r.t. r.o.c.p., under rajmahal area.
Eastern Coalfields Limited | ECL_Rajmahal area · Jharkhand Closed 13/10/2026
View tender -
Dismantling and erection cum re arrangement of the 10 inch dia m.s. pipes along with other miscellaneous jobs, needed for shifting of the 2500 g.p.m. kirloskar make pump, in operation at the deep mine zone at r.o.c.p. mine under rajmahal area
Eastern Coalfields Limited | ECL_Rajmahal area · Jharkhand Closed 20/10/2026
View tender -
Dismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the 2000 g.p.m. pump motor set, in mine, supplying water to the village pond, w.r.t. karo ocp, under bnk area
Central Coalfields Limited | Public Sector Undertakings · KARO OCP Closed 29/11/2024
View tender -
Dismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Central Coalfields Limited | Public Sector Undertakings · KARO OCP Closed 07/04/2025
View tender -
Dismantling and laying of 8 inch dia m.s. pipeline required for di of the delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area.
Central Coalfields Limited | Public Sector Undertakings · Karo OCP Closed 18/10/2024
View tender -
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Central Coalfields Limited | Public Sector Undertakings · KARO OCP Closed 16/06/2025
View tender -
Dismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine for developement of haul road w.r.t. karo ocp, under bnk area
Central Coalfields Limited | Public Sector Undertakings · KARO OCP Closed 15/09/2025
View tender -
Dismantling, cutting and laying of 8 inch dia m.s. pipeline needed for di of the delivery pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk a
Central Coalfields Limited | Public Sector Undertakings · KARO OCP Closed 05/02/2025
View tender -
Cutting, jointing and laying of 8 inch dia g.i. pipeline required for di of the delivery side pipeline of the 2000 g.p.m. pump motor set installed in mine, involved in supplying water to the village pond, owing to haul road development, w.r.t.
Central Coalfields Limited | Public Sector Undertakings · Karo OCP Closed 03/07/2024
View tender