Tender Details
Particulars | Details |
---|---|
Title |
Improvement Sh 260 To Hiradgaon Joint Road To Hiradgaon Tanda Mdr 40 Road With Cd Work Km 0/00 To 2/00 Tq.Umri.
|
Description |
Improvement Sh 260 To Hiradgaon Joint Road To Hiradgaon Tanda Mdr 40 Road With Cd Work Km 0/00 To 2/00 Tq.Umri.
|
Organisation | RDD-CEO-NANDED | State Govt. and UT |
Tender Id | 2024_NANDE_1095640_1 |
Reference Number |
ZPN/WD/Bhokar/e.TEN 17/OPEN/24-25 |
Tender Fee | 1680 |
EMD | 2 Lakh |
Tender Value | |
Place | Improvement SH 260 to Hiradgaon joint road to Hira |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1920727 |
Start Date | October 07, 2024 14:30 |
End Date |
14/10/2024 ( Expired 213 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreWidening and strengthening of soyala osian road km 0/0 to 51/0 (mdr-384)
Widening and strengthening of soyala osian road km 0/0 to 51/0 (mdr-384)
Read moreSurfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road
Surfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road
Read morePeriodical repair of road fromnh-108-b to hezamara phc (l-0.450 km) during the year 2025-26/ sh unlined surface drains granular sub base,wbm-2, wbm-3, patch repair, carpeting, etc. complete.
Periodical repair of road fromnh-108-b to hezamara phc (l-0.450 km) during the year 2025-26/ sh unlined surface drains granular sub base,wbm-2, wbm-3, patch repair, carpeting, etc. complete.
Read morePeriodical repair of road from barkathal new market to barkathal tsr camp ( l-1.25 km) during the year 2025-26/ sh unlined surface drains, carpeting, cd, etc. complete
Periodical repair of road from barkathal new market to barkathal tsr camp ( l-1.25 km) during the year 2025-26/ sh unlined surface drains, carpeting, cd, etc. complete
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreWidenning and strenthening of existing road from 3.75 to 10.00 mtr of approach road from tunkara -balara- rabriyawas to nh-158/sh-39 (ras merta highway) km 0/0 to 11/000
Widenning and strenthening of existing road from 3.75 to 10.00 mtr of approach road from tunkara -balara- rabriyawas to nh-158/sh-39 (ras merta highway) km 0/0 to 11/000
Read moreof your Industry type