Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of New Major Bridge Over Purna River Near Viraval Between Km 363/360 To Km 364/360 Of Nh 64 In Navsari District In The State Of Gujarat On Engineering Procurement And Construction Epc Mode
|
Description |
Construction Of New Major Bridge Over Purna River Near Viraval Between Km 363/360 To Km 364/360 Of Nh 64 In Navsari District In The State Of Gujarat On Engineering Procurement And Construction Epc Mode
|
Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 52.72 Lakh |
Tender Value | |
Place | Bharuch |
Link |
AAAAAAAAAA Login to view |
Start Date | June 19, 2025 21:40 |
End Date |
31/07/2025 ( 26 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreCs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreConsultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Read moreConsultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreConstruction of 2l - ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan (job no. nh-23/rj/2024-25/865)
Construction of 2l - ps configuration karauli bypass on nh-23 under annual plan 2024-25 on epc mode in the state of rajasthan (job no. nh-23/rj/2024-25/865)
Read moreof your Industry type