Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cs For Supervision Of Dubrajpur Bypass With 4 Lane Configuration Of Length 5.676 Km On Nh 60 (New Nh 14) From Design Chainage 0.00 (Existing Km 316.135 On Nh60) To Design Chainage 5.676 (Existing Km 320.980 On Nh 60) In Birbhum West Bengal In Epc Mod
|
| Description |
Cs For Supervision Of Dubrajpur Bypass With 4 Lane Configuration Of Length 5.676 Km On Nh 60 (New Nh 14) From Design Chainage 0.00 (Existing Km 316.135 On Nh60) To Design Chainage 5.676 (Existing Km 320.980 On Nh 60) In Birbhum West Bengal In Epc Mod
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2025_MoRTH_867102_1 |
|
Reference Number |
MORTH/RO-KOL/NIT/AE/2025-26/03 |
| Tender Fee | 5000 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | Dubrajpur |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=911536 |
| Start Date | August 04, 2025 16:30 |
| End Date |
Expired
25/08/2025
Expired 361 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreOnstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Onstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Read moreCs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode
Cs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode
Read moreConstruction of dubrajpur bypass with 4 lane
Construction of dubrajpur bypass with 4 lane configuration of length 5.676 km on nh 60 (new nh 14) (existing km 316.135 on nh 60) (existing km 320.980 on nh 60) in the district of birbhum, west bengal in epc mode.(job no-014-wb-2022-23/518)
Read moreShifting of utilities water pipe lin possessed by adda for the work construction of 4 lane raniganj bypass of length 5.261 km on nh 60 new nh-14 from km 275.20 of nh 60 to km 418.18 of nh-2 new nh-19 in paschim bardhaman, west bengal in epc,,,,,,,,,
Shifting of utilities water pipe lin possessed by adda for the work construction of 4 lane raniganj bypass of length 5.261 km on nh 60 new nh-14 from km 275.20 of nh 60 to km 418.18 of nh-2 new nh-19 in paschim bardhaman, west bengal in epc,,,,,,,,,
Read moreConstruction of champawat bypass with two lane with paved shoulder configuration ing from existing chainage 121.700 to existing chainage 129.450 (design length 9.847) of nh-125 in district-champawat in the state of uttrakhand on epc
Construction of champawat bypass with two lane with paved shoulder configuration ing from existing chainage 121.700 to existing chainage 129.450 (design length 9.847) of nh-125 in district-champawat in the state of uttrakhand on epc
Read moreConstruction of additional major bridge with 4-lane configuration of length 1.48 km on nh-60 (nh-14) over river kangshabati from km. 117.770 to km 119.250 and additional major bridge with 4-lane configuration of length 0.900 km on nh-60 (nh-14) over
Construction of additional major bridge with 4-lane configuration of length 1.48 km on nh-60 (nh-14) over river kangshabati from km. 117.770 to km 119.250 and additional major bridge with 4-lane configuration of length 0.900 km on nh-60 (nh-14) over
Read moreCs for supervision of construction of major bridge with 4lane configuration on nh 14 over kangsabati and shilabati river in paschim medinipur of west bengal on epc mode
Cs for supervision of construction of major bridge with 4lane configuration on nh 14 over kangsabati and shilabati river in paschim medinipur of west bengal on epc mode
Read moreConstruction of 4 lane raniganj bypass
Construction of 4 lane raniganj bypass from km 273.000 of nh 60 (new nh 14) to km 478.18 of nh-2 (new nh 19) in paschim bardhaman, west bengal in epc mode. (job no. 014- wb-2022-23/514)
Read moreCs for supervision of ramnagar bypass of nh 116b in the district of purba medinipur west bengal in epc mode.
Cs for supervision of ramnagar bypass of nh 116b in the district of purba medinipur west bengal in epc mode.
Read moreof your Industry type