Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bengaluru Mysuru Section: Sw I: Additional Vent Way To Bridge No. 572 At Km 55/200 300 In Cpt Yard Existing 1x2.40x1.2m Rcc Box. Proposed 1 X 3.0m X 2.0m (26.11m Barrel) Rcc Box By Launching Method In Aden/Mya Sub Division. Sw Ii: Replacement Of Steel Girder With Psc Slabs Of Size Above 9.15m And Up To 12.20m Span Bridges For Bridge No. 448 At Km 8/398 Between Nhy Gnn Stations Of Bengaluru Mysuru Section (Total 19 Bridges). Sw Iii: Proposed Fixing Of Sign Boards On Approaches Of Bridge
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73963172 |
|
Reference Number |
06SBC24of07-03-2024-Item1 |
| Tender Fee | 0 |
| EMD | 2.64 Lakh |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73963172/viewNitPdf_4500543.pdf |
| Start Date | March 07, 2024 22:24 |
| End Date |
Expired
30/03/2024
Expired 892 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Bengaluru - mysuru section: sw-i: additional vent way to bridge no. 572 at km 55/200-300 in cpt yard - existing 1x2.40x1.2m rcc box. proposed - 1 x 3.0m x 2.0m (26.11m barrel) rcc box by launching method in aden/mya sub division. sw-ii: proposed fixing of sign boards on approaches of bridges (29nos) br. no. 448dn, 583dn, 610up, 627up&dn of sbc-mys section = 5bridges. maintenance period is 6 months.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: additional vent way to bridge no. 572 at km 55/200-300 in cpt yard - existing 1x2.40x1.2m rcc box. proposed - 1 x 3.0m x 2.0m (26.11m barrel) rcc box by launching method in aden/mya sub division. sw-ii: proposed fixing of sign boards on approaches of bridges (29nos) br. no. 448dn, 583dn, 610up, 627up&dn of sbc-mys section = 5bridges. maintenance period is 6 months.
For complete deion and other details, please refer to tender
Read moreKsr bengaluru: sw-i: proposed civil works for the provision of lift - 1no. at pf no. 9 and 10 for fob at bnc end of ksr bengaluru station. sw-ii: proposed civil works for the provision of lift - 1no. at pf no. 5 and 6 for fob at bnc end of ksr bengaluru station. sw-iii: provision of lift to fob connecting metro sky walk on back side of ksr bengaluru station. sw-iv: ksr bengaluru - mysore section: proposed constructions of track men rest room/tool room. - 7nos. in aden/mya section - balance
For complete deion and other details, please refer to tender
Read moreKsr bengaluru: sw-i: proposed civil works for the provision of lift - 1no. at pf no. 9 and 10 for fob at bnc end of ksr bengaluru station. sw-ii: proposed civil works for the provision of lift - 1no. at pf no. 5 and 6 for fob at bnc end of ksr bengaluru station. sw-iii: provision of lift to fob connecting metro sky walk on back side of ksr bengaluru station. sw-iv: ksr bengaluru - mysore section: proposed constructions of track men rest room/tool room. - 7nos. in aden/mya section - balance
For complete deion and other details, please refer to tender
Read moreSr.den/w/sbc section: sw-i: aden/mya sub division: reconstruction of type-ii quarters in lieu of quarters no. 24/a and b, 25/a and b (4 units) at channapatna (cpt). sw-ii: ksr bengaluru: upgradation of general infrastructure at divisional store depot (dsd)/sbc- proposed improvements to roofing, construction of strong rooms at divisional store depot (dsd)/sbc. sw-iii: ksr bengaluru - mysore section: proposed constructions of track men rest room/tool room. - 7nos. in aden/mya section - (balance
For complete deion and other details, please refer to tender
Read moreSw i: replacement of steel girder with psc slab for bridge no. 490 (1x12.20m) at km 29/800-900 between rajanukunte and dodballapur stations of baiyappanahalli - dharmavaram section. sw-ii: replacement of steel girder with psc slabs of size above 9.15m and up to 12.20m span bridges for bridge no. 448 at km 8/398 between nayandahalli (nyh) - jnana bharati halt (gnb) stations of bengaluru - mysuru section. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: hejjala iridm - proposed construction of boundary wall between km 19/400 to 20/400 at hejjala iridm along the demonstration track for 140 tonne cranes. sw-ii: proposed improvements for video surveillance system at ksr bengaluru (sbc), bangalore cantt (bnc) and mandya (mya) stations. maintenance period is 6months.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: improvements to road-5 loading and unloading area at settihalli (settihalli) from km 62/300-900 and construction of merchant room at settihalli yard. sw-ii: proposed provision of pay and use toilets at settihalli (set) - (platform - 1) and bidadi (bid) (platform 1/2). sw-iii: proposed improvements for video surveillance system at ksr bengaluru (sbc), bangalore cantt (bnc) and mandya (mya) stations. maintenance period is 12months.
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreBengaluru - mysuru section: sw-i: strengthening of bank by providing standard width in isolated location from 46/400 to 99/000 in up and down line. sw-ii: ttr of existing 1 in 12 curved switch with tws and weldable cms crossings - 8nos at mandya and hanakere yard. sw-iii: bengaluru - mysuru section: replacement of overaged sej with psc improved sej - 52kg from km 72/300-100/900 - total 16nos in aden/mya section. maintenance period is 6 months or one monsoon period whichever is later. (compos
For complete deion and other details, please refer to tender
Read moreof your Industry type