Tender Details
Particulars | Details |
---|---|
Title |
Action Plan2023 24 Rectification Works To Right Side Wall Of Main Canal At Ch 6 850 Km And Field Channel Between Ch 0 030 To 0 080 Km Of 26 Field Boothie
|
Description |
Ewe, Cement Concrete, Centring,Plastering Etc
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_675962_1 |
Reference Number |
1/IRR/P1/CSM/Emr/5107/2023/alr |
Tender Fee | 560 |
EMD | 6352 |
Tender Value | |
Place | Alathur |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1051107 |
Start Date | June 14, 2024 23:30 |
End Date |
26/06/2024 ( Expired 320 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing and erecting safety crash barrier between ch.14.445 kms to ch.14.645 kms on n.i.p. side of sip main canal near sirvoi bridge in village sirvoi of quepem taluka.
Providing and erecting safety crash barrier between ch.14.445 kms to ch.14.645 kms on n.i.p. side of sip main canal near sirvoi bridge in village sirvoi of quepem taluka.
Read morePeriodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)
Periodical renewal to nh16 to nh-44 via donkal, renjarla from km 14/0 to 23/850 including construction of h.p culvert at km 6/2-4, 6/6-8, 7/2-4,9/8-10 and protective wall at km 8/8 in nizamabad district.. (sub work- providing road safety interventions)
Read moreMtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch.0.50 km to ch.1.25 km) group i.
Mtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch.0.50 km to ch.1.25 km) group i.
Read moreMtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch. 1.25 km to ch.2.00 km) group ii.
Mtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch. 1.25 km to ch.2.00 km) group ii.
Read moreConstruction of protection wall and protective mesh for tunnel shaft, resectioning of canal from 0 to 26 km, protection wall/bund for jankapur tank on ghodazari branch canal.
Construction of protection wall and protective mesh for tunnel shaft, resectioning of canal from 0 to 26 km, protection wall/bund for jankapur tank on ghodazari branch canal.
Read moreRemoval of deposited earth in approach channel of sluice gate in upstream ch. 0 to 03 and down streem ch. 03 to 10 dhuty l.b.c. main canal
Removal of deposited earth in approach channel of sluice gate in upstream ch. 0 to 03 and down streem ch. 03 to 10 dhuty l.b.c. main canal
Read moreWrd/imd/ranchi/02/2025-26 renovation of us and hr gate at head works site of vijay weir scheme and chain at 7.7 km and at 3.2 km of vijay main canal.
Wrd/imd/ranchi/02/2025-26 renovation of us and hr gate at head works site of vijay weir scheme and chain at 7.7 km and at 3.2 km of vijay main canal.
Read moreConstruction of slope linning in between rd 19300m to 19365m of gohira right main canal for the year 2025-26.
Construction of slope linning in between rd 19300m to 19365m of gohira right main canal for the year 2025-26.
Read moreConstruction of granular sub base of sahawa disty. from km 20.00 to 30.000 (right side) of ch. kra lift canal.
Construction of granular sub base of sahawa disty. from km 20.00 to 30.000 (right side) of ch. kra lift canal.
Read moreRestoration of rain damages on nh 305 sainj luhri aut road km 0/00 to 97/00 sh. construction of breast wall in random rubble masonry at rd 73/030 to 73/045.
Restoration of rain damages on nh 305 sainj luhri aut road km 0/00 to 97/00 sh. construction of breast wall in random rubble masonry at rd 73/030 to 73/045.
Read moreof your Industry type