Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
General Action Plan 2024 25 Kpip Am Rectification Works To Mannampetta No 1 Distributory Between Ch 0 800 Km And 0 850 Km General Civil Work
|
Description |
General Action Plan 2024 25 Kpip Am Rectification Works To Mannampetta No 1 Distributory Between Ch 0 800 Km And 0 850 Km General Civil Work
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_698410_1 |
Reference Number |
IRR/PI/TR/3211/2024_5_3_2/1 |
Tender Fee | 655 |
EMD | 7415 |
Tender Value | |
Place | Kalladikode |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1089922 |
Start Date | October 21, 2024 21:30 |
End Date |
04/11/2024 ( Expired 239 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreSpecial repair of various rural link roads falling in mc mansa and sardulgarh (earth work to premix work incld. const. of culverts, drain etc) distt. mansa group no 1(25-067)
Special repair of various rural link roads falling in mc mansa and sardulgarh (earth work to premix work incld. const. of culverts, drain etc) distt. mansa group no 1(25-067)
Read moreMaintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Read moreConstruction of atal path widening and cc road work from sh-62 to bijapur road in km 0/0 to 1/250
Construction of atal path widening and cc road work from sh-62 to bijapur road in km 0/0 to 1/250
Read moreConstruction of alteranate connectivity for quarab land slide location at km.55 on nh 87 e new 109 co 18mt bailey bridge at chainage 1.575 and co 60mt bailey bridge at chainage 2.750 and civil work between chainage 2.675 to 3.000
Construction of alteranate connectivity for quarab land slide location at km.55 on nh 87 e new 109 co 18mt bailey bridge at chainage 1.575 and co 60mt bailey bridge at chainage 2.750 and civil work between chainage 2.675 to 3.000
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreEmergent repairing work of bblr (sh-11a) from 58.770 km to 58.99 km by providing gsb-iii, wmm layer, bm, p.c. s.c. and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under berhampore division no.-i, p.w.d during 25-26
Emergent repairing work of bblr (sh-11a) from 58.770 km to 58.99 km by providing gsb-iii, wmm layer, bm, p.c. s.c. and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under berhampore division no.-i, p.w.d during 2025-
Read moreof your Industry type