Tender Details
Particulars | Details |
---|---|
Title |
General Action Plan 2024 25 Kpip Am Rectification Works To Mannampetta No 1 Distributory Between Ch 0 800 Km And 0 850 Km General Civil Work
|
Description |
General Action Plan 2024 25 Kpip Am Rectification Works To Mannampetta No 1 Distributory Between Ch 0 800 Km And 0 850 Km General Civil Work
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_698410_1 |
Reference Number |
IRR/PI/TR/3211/2024_5_3_2/1 |
Tender Fee | 655 |
EMD | 7415 |
Tender Value | |
Place | Kalladikode |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1089922 |
Start Date | October 21, 2024 21:30 |
End Date |
04/11/2024 ( Expired 217 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreJjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Read more8401/e8 maint and certain repair/replacement to sanitary fitting, plumbing works,pcc flooring, brick work, plastering work, hardstanding, roofing sheet, ceiling, joinery and internal elect fd hosp no 1 and 2 under ge east bareilly
8401/e8 maint and certain repair/replacement to sanitary fitting, plumbing works,pcc flooring, brick work, plastering work, hardstanding, roofing sheet, ceiling, joinery and internal elect fd hosp no 1 and 2 under ge east bareilly
Read moreMtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Mtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Read moreDesign supply and installation of 1 no 31 to 45 hp solar submersible pumps with raising main hdpe pipe125mm dai pn16 and pe100 and all allied civil works accessories including testing commissioning and operation and maintenance of the scheme for a p
Design supply and installation of 1 no 31 to 45 hp solar submersible pumps with raising main hdpe pipe125mm dai pn16 and pe100 and all allied civil works accessories including testing commissioning and operation and maintenance of the scheme for a p
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read moreGeneral sabarimala festival 2024 25 bc overlay 7 700 km improvements to thiruvalla kumbazha road km 21 650 to 29 350 under pathanamthitta section general civil work
General sabarimala festival 2024 25 bc overlay 7 700 km improvements to thiruvalla kumbazha road km 21 650 to 29 350 under pathanamthitta section general civil work
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read moreof your Industry type