Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Part Dismantling Of 6 Inch Dia And 8 Inch Dia Pipe And Laying Of 6 Inch Dia And 8 Inch Dia Pipe Line Along Mine Boundry For Di Of Existing Pipe Line To Clear The Area For Mining Activities, Feeding Water To Tanker Filling Point Near Parking
|
| Description |
Part Dismantling Of 6 Inch Dia And 8 Inch Dia Pipe And Laying Of 6 Inch Dia And 8 Inch Dia Pipe Line Along Mine Boundry For Di Of Existing Pipe Line To Clear The Area For Mining Activities, Feeding Water To Tanker Filling Point Near Parking
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_311158_1 |
|
Reference Number |
PO(AK)/PE(EnM)/e-NIT/24-25/13 |
| Tender Fee | 0 |
| EMD | 3100 |
| Tender Value | |
| Place | Ashok OCP, Piparwar Area Chatra, Jharkhand-829201 |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=322444 |
| Start Date | June 25, 2024 14:30 |
| End Date |
Expired
05/07/2024
Expired 726 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreLaying and changing of 6 inch and 8 inch dia pipe line for making an arrangement for tanker filling point at 4216 pond and changing of damaged 8 inch water supply pipe line for plant under chp-cpp,ppr.
Laying and changing of 6 inch and 8 inch dia pipe line for making an arrangement for tanker filling point at 4216 pond and changing of damaged 8 inch water supply pipe line for plant under chp-cpp,ppr.
Read moreDismantling diversion of the existing 6 inch dia gi pipe line required for erection of tanker point in main sump d.d mines under bokaro colliery
Dismantling diversion of the existing 6 inch dia gi pipe line required for erection of tanker point in main sump d.d mines under bokaro colliery
Read moreDismantling /di of m.s pipe line(6 inch/ 8 inch/10 inch above) works and associated jobs
For the work dismantling and removal, recovery of 10 inch and 8 inch pipeline (approx. 1080 mtr) from sbocp (ii) and di of 6 inch dia m.s pipe line range for the length of 150 mtr. at nichitpur colliery under sijua area.
Read moreDismantling, repair, fabrication and erection of 8 inch dia m.s pipe line and dismantling and fitting of flange 8 inch and valve 8 inch at coal stock heap no. 12 with extension of g.i pipe line 6 inch dia with fitting of 6 inch sluice valve and conne
Dismantling, repair, fabrication and erection of 8 inch dia m.s pipe line and dismantling and fitting of flange 8 inch and valve 8 inch at coal stock heap no. 12 with extension of g.i pipe line 6 inch dia with fitting of 6 inch sluice valve and conne
Read moreDismantling of 8 inch/10 inch dia ms pipe line related things with pump motor at 9 seem under abocp mine
Dismantling of 8 inch/10 inch dia ms pipe line related things with pump motor at 9 seem under abocp mine
Read moreLaying and fixing of 6 inch and 8 inch dia ms pipes from existing discharge point near to rks crusher and 6 inch and 4 inch dia pipe including jointing for feeding of water to new proposed plantation area in respect of rohini project
Laying and fixing of 6 inch and 8 inch dia ms pipes from existing discharge point near to rks crusher and 6 inch and 4 inch dia pipe including jointing for feeding of water to new proposed plantation area in respect of rohini project
Read moreDismantling, erection and di of the existing 440 v oh line feeding power to weighbridges no. 4 and 6 and karo basti, required to clear the area needed for progress of the mine, w.r.t. karo ocp, bnk area.
Dismantling, erection and di of the existing 440 v oh line feeding power to weighbridges no. 4 and 6 and karo basti, required to clear the area needed for progress of the mine, w.r.t. karo ocp, bnk area.
Read moreRe-organization of 8 inch dia pipe and dismantling.
Re-organization of 8 inch dia pipe and dismantling.
Read moreMaintenance /repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project
Maintenance/ repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project under hazaribagh area
Read moreof your Industry type