Laying And Dismantling Of 10 Inch, 8 Inch,6 Inch And 4 Inch Dia Ms Pipeline For Dewatering Mine Water To Facilitate For Coal And Ob Production And Laying Of Pipeline In Lilari Ocp For Water Filling Point From Quarry At Ilbl Ocp,Lakhanpur Area, Mcl.
|
Description |
Laying And Dismantling Of 10 Inch, 8 Inch,6 Inch And 4 Inch Dia Ms Pipeline For Dewatering Mine Water To Facilitate For Coal And Ob Production And Laying Of Pipeline In Lilari Ocp For Water Filling Point From Quarry At Ilbl Ocp,Lakhanpur Area, Mcl.
|
Organisation | Mahanadi Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_MCL_318791_1 |
Reference Number |
MCL/LKPA/EnM/eNIT/24-25/29 Dt-07.10.2024 |
Tender Fee | 0 |
EMD | 77700 |
Tender Value | |
Place | ILBL OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330421 |
Start Date | October 08, 2024 15:30 |
End Date |
23/10/2024 ( Expired 202 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling, shifting and laying of pipeline of 6 inch dia ( 800m approx.) as per requirement with priming arrangement and replacement of different types of damaged valves in existing pipelines at amrapali ocp under a-c area
Dismantling, shifting and laying of pipeline of 6 inch dia ( 800m approx.) as per requirement with priming arrangement and replacement of different types of damaged valves in existing pipelines at amrapali ocp under a-c area
Read moreDismantling, laying and joining of 8 diameter and 6 diameter pipeline with accessories like flange welding, rubber ion ,bend ,sluice valve and nrv etc for dewatering of different quarry for monsoon preparation 2025-26 of govindpur ph-ii ocp
Dismantling, laying and joining of 8 diameter and 6 diameter pipeline with accessories like flange welding, rubber ion ,bend ,sluice valve and nrv etc for dewatering of different quarry for monsoon preparation 2025-26 of govindpur ph-ii ocp
Read moreShifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Shifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Read moreLaying of two nos. 8 inch dia delivery range and two nos. 10 inch dia delivery range from jehlitand sump to sona dubha nallah and dismantling of existing four nos. of delivery range for clearing the dumping area under kdh ocp, nk area
Laying of two nos. 8 inch dia delivery range and two nos. 10 inch dia delivery range from jehlitand sump to sona dubha nallah and dismantling of existing four nos. of delivery range for clearing the dumping area under kdh ocp, nk area
Read moreDismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Dismantling laying pipe cutting jointing (welding) etc of 6 inch-300 mtr 8 inch dia-200 mtr 4 inch- 150 mtr. pipeline for shifting of pumps at main sump firefighting locations and others as and whenever required under ttk ocp rajhara area
Read moreMaking of 03 nos of 8 inch dia ms pipeline range (welding of flanges, shifting, laying and jointing of pipes) from rvi to outside nallah discharge for smooth dewatering under s.b. project.
Making of 03 nos of 8 inch dia ms pipeline range (welding of flanges, shifting, laying and jointing of pipes) from rvi to outside nallah discharge for smooth dewatering under s.b. project.
Read moreLaying of water supply pipeline from tanker filling point near coal stock 44 to coal stock 43 44 and 45 at sec 2 under rocp
Laying of water supply pipeline from tanker filling
 point near coal stock 44 to coal stock 43 44 and 45 at sec 2 under rocp
Read moreLaying of 6 inch(150mm) diameter pipeline (approx 400m) for mine dewatering at new patch of potanga quarry under urimari ocp.
Laying of 6 inch(150mm) diameter pipeline (approx 400m) for mine dewatering at new patch of potanga quarry under urimari ocp.
Read moreRepairing, maintenance, dismantling, shifting and re erection of high mast towers in north and south quarry, ilbl ocp, lakhanpur area, mcl
Repairing, maintenance, dismantling, shifting and re erection of high mast towers in north and south quarry, ilbl ocp, lakhanpur area, mcl
Read moreLaying of 8 inch(200mm) diameter pipeline (approx 700m) before upcoming monsoon for mine dewatering at old potanga quarry under urimari ocp.
Laying of 8 inch(200mm) diameter pipeline (approx 700m) before upcoming monsoon for mine dewatering at old potanga quarry under urimari ocp.
Read moreof your Industry type