Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Laying And Changing Of 6 Inch And 8 Inch Dia Pipe Line For Making An Arrangement For Tanker Filling Point At 4216 Pond And Changing Of Damaged 8 Inch Water Supply Pipe Line For Plant Under Chp Cpp,Ppr.
|
| Description |
Laying And Changing Of 6 Inch And 8 Inch Dia Pipe Line For Making An Arrangement For Tanker Filling Point At 4216 Pond And Changing Of Damaged 8 Inch Water Supply Pipe Line For Plant Under Chp Cpp,Ppr.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_290205_1 |
|
Reference Number |
PE(Mech.)/CHP/e-NIT/23-24/17 |
| Tender Fee | - |
| EMD | 1500 |
| Tender Value | - |
| Place | OFFICE OF PO CHP-CPP, Piparwar Area, CCL |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | October 03, 2023 22:30 |
| End Date |
Expired
12/10/2023
Expired 1098 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cleaning of blocked drain and pot holes filling in different location of chp cpp under chp cpp piparwar area.
Cleaning of blocked drain and pot holes filling in different location of chp cpp under chp cpp piparwar area.
Read moreRepair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.
Repair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.
Read moreRepairing, reconditioning, spare changing of vt pump 3303 installed at 4216 pond under chp-cpp, piparwar area.
Repairing, reconditioning, spare changing of vt pump 3303 installed at 4216 pond under chp-cpp, piparwar area.
Read moreProviding and fixing v belts in de watering screen under chp-cpp/ppr.
Providing and fixing v belts in de watering screen under chp-cpp/ppr.
Read moreDismantling and erection of 440 v o/h line, pole, conductor with changing of damage stay and earthing at billari village under chp/cpp,ppr.
Dismantling and erection of 440 v o/h line, pole, conductor with changing of damage stay and earthing at billari village under chp/cpp,ppr.
Read moreReplacement of damage insulators, stay set , iron bracket and tensioning of 440 v o/h line conductors at bachra siding under chp-cpp/ppr. due to damage by transporting truck under chp-cpp, ppr.
Replacement of damage insulators, stay set , iron bracket and tensioning of 440 v o/h line conductors at bachra siding under chp-cpp/ppr. due to damage by transporting truck under chp-cpp, ppr.
Read moreProviding and fixing 3d-led safety related sign boards for different weighbridges under chp-cpp, ppr.
Providing and fixing 3d-led safety related sign boards for different weighbridges under chp-cpp, ppr.
Read moreSupply and fixing of 100 amp. 3.3 kv rating hrc out fuse under chp-cpp/ppr.
Supply and fixing of 100 amp. 3.3 kv rating hrc out fuse under chp-cpp/ppr.
Read moreRepairing of 50 mt capacity digitizer of electronic road weighbridge no.1 of chp-cpp, ppr. .
Repairing of 50 mt capacity digitizer of electronic road weighbridge no.1 of chp-cpp, ppr. .
Read moreDecorative lighting of control room, office building and bachra siding of chp-cpp on 1st nov.(cil day) and 26 jan. 2024 (republic day) under chp-cpp,ppr.
Decorative lighting of control room, office building and bachra siding of chp-cpp on 1st nov.(cil day) and 26 jan. 2024 (republic day) under chp-cpp,ppr.
Read moreof your Industry type