Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing And Fixing Of Different Ratings Tp Mccb And Mcb For Different Type Of Motors Installed At 4212, 4214, 4216, 4213 And Weighbridge And Cable Termination Kit For Trailing Cables Under Chp/Cpp, Ppr.
|
| Description |
Providing And Fixing Of Different Ratings Tp Mccb And Mcb For Different Type Of Motors Installed At 4212, 4214, 4216, 4213 And Weighbridge And Cable Termination Kit For Trailing Cables Under Chp/Cpp, Ppr.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_337346_1 |
|
Reference Number |
PE/Elec/CHP/PPR/e-NIT/25-26/09 |
| Tender Fee | 0 |
| EMD | 4200 |
| Tender Value | |
| Place | OFFICE OF PO CHP-CPP, Piparwar Area, CCL |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=349707 |
| Start Date | June 11, 2025 22:30 |
| End Date |
Expired
21/06/2025
Expired 360 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Recovering and laying of 11 kv, 120 sq.mm, 3 core aluminum power cable from 4213 sub-station and 4214 sub-station under chp-cpp/ppr.
Recovering and laying of 11 kv, 120 sq.mm, 3 core aluminum power cable from 4213 sub-station and 4214 sub-station under chp-cpp/ppr.
Read moreProviding and fixing 3d-led safety related sign boards for different weighbridges under chp-cpp, ppr.
Providing and fixing 3d-led safety related sign boards for different weighbridges under chp-cpp, ppr.
Read moreProviding and fixing cable end termination by heat shrink cable jointing kit for cables of power distribution transformers installed at r.r shop, kathara
Providing and fixing cable end termination by heat shrink cable jointing kit for cables of power distribution transformers installed at r.r shop, kathara
Read moreProviding and fixing cable end termination by heat shrink cable jointing kit for cables of power distribution transformers installed at r.r shop, kathara
Providing and fixing cable end termination by heat shrink cable jointing kit for cables of power distribution transformers installed at r.r shop, kathara
Read moreProviding and fixing load cell compressive type 23 ton for w/b no- 02 under chp-cpp/ppr, piparwar area.
Providing and fixing load cell compressive type 23 ton for w/b no- 02 under chp-cpp/ppr, piparwar area.
Read moreProviding and fixing complete earthling set (additional)for 100 kva transformer and mono block pump installed at bachra siding under chp-cpp/ppr
Providing and fixing complete earthling set (additional)for 100 kva transformer and mono block pump installed at bachra siding under chp-cpp/ppr
Read moreProviding and fixing of termination kit for different size of 6.6/11 kv grade cables in jhingurda project
Providing and fixing of termination kit for different size of 6.6/11 kv grade cables in jhingurda project
Read moreProviding and fixing of end termination cable jointing and cable gland of different size cables at different substations, pumping station of sirka colliery
Providing and fixing of end termination cable jointing and cable gland of different size cables at different substations, pumping station of sirka colliery
Read moreProviding and fixing bridge rectifier, module single diode, speed monitor and ceramic porcelain busbar support with related spares at different location under chp-cpp/ppr.
Providing and fixing bridge rectifier, module single diode, speed monitor and ceramic porcelain busbar support with related spares at different location under chp-cpp/ppr.
Read more1) repairing, reconditioning, spare changing of wilo 2- stage pump installed at 4212 section. (2) repairing and reconditioning of 02 no. fluid coupling tvc-562 for primary crusher 2101 under chp-cpp, ppr.
1) repairing, reconditioning, spare changing of wilo 2- stage pump installed at 4212 section. (2) repairing and reconditioning of 02 no. fluid coupling tvc-562 for primary crusher 2101 under chp-cpp, ppr.
Read moreof your Industry type