Tender Details

Particulars Details
Title
Hiring Taxi Jeep With Driver To Electrical Section Kuttippuram From 01 04 2025 To31 03 2026 On Contract Basis
Description
Hiring Taxi Jeep With Driver To Electrical Section Kuttippuram From 01 04 2025 To31 03 2026 On Contract Basis
Organisation Kerala State Electricity Board | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 472
EMD 500
Tender Value
Place Electrical Section , Kuttippuram
Link

AAAAAAAAAA

Login to view
Start Date May 30, 2025 15:30
End Date

13/06/2025 ( 11 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas

Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas

Read more
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.

Construction of toll plaza at ch. 80.100 near narsi namdeo on risod to hingoli from km 44.220 to km 97.450 section of nh 461 b in the state of maharashtra on risk and cost of contractor on epc basis mode.

Read more
Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24

Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24

Read more
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham

Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham

Read more
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.

Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.

Read more
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.

Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.

Read more
Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to two lane with paved shoulder configuration in the state of madhya pradesh on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise