Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Ichp Dismantling The Existing Damaged Corroded Floor Chequered Plates And Erection Of New Chequered Plates In Eastern Side Of Conveyor 27 A Take Up Floor.
|
| Description |
Ttps Ichp Dismantling The Existing Damaged Corroded Floor Chequered Plates And Erection Of New Chequered Plates In Eastern Side Of Conveyor 27 A Take Up Floor.
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_508030_1 |
|
Reference Number |
CE/SE/MI/TTPS/129/2024-2025 |
| Tender Fee | 0 |
| EMD | 5800 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=604334 |
| Start Date | December 06, 2024 14:30 |
| End Date |
Expired
23/12/2024
Expired 662 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mech ii bm unit i replacement of damaged bottom plate corroded portion of side plate including supply fabrication dismantling and erection of cst tank in unit i boiler
Ttps mech ii bm unit i replacement of damaged bottom plate corroded portion of side plate including supply fabrication dismantling and erection of cst tank in unit i boiler
Read moreTtps mech ii bm unit iii dismantling the existing seal plates and re erection after rectification works in bah and overhauling of boiler fill pumps hot well makeup pumps during 2026 2027 overhaul
Ttps mech ii bm unit iii dismantling the existing seal plates and re erection after rectification works in bah and overhauling of boiler fill pumps hot well makeup pumps during 2026 2027 overhaul
Read moreStrengthening of existing side pathway and replacement of corroded /perforated members like m.s chequered plates by ss antiskid chequered plates of gang way , side pathway ,man refuse and tolly refuse of br. no.-12 up, 20 up, 51 a, 83 up, 91 dn , 105 dn, 106 dn, 119 dn, 168 a, 169 , 171,171a, 173, 174 a, 179, 180 a ,215, 217 and 230 in bb loop and provision of new path at br. nos 2, 5, 6 in nh-bdc section & tpkr fly over of howrah division.
Strengthening of existing side pathway and replacement of corroded /perforated members like m.s chequered plates by ss antiskid chequered plates of gang way , side pathway ,man refuse and tolly refuse of br. no.-12 up, 20 up, 51 a, 83 up, 91 dn , 105 dn, 106 dn, 119 dn, 168 a, 169 , 171,171a, 173, 174 a, 179, 180 a ,215, 217 and 230 in bb loop and provision of new path at br. nos 2, 5, 6 in nh-bdc section & tpkr fly over of howrah division.
Read moreStrengthening of existing side pathway and replacement of corroded/perforated members like m.s chequered plate by ss antiskid chequred plates of gang way, side pathway, man refuse and tolly refuse of br. no.12 up, 20 up , 51 up, 83 up, 91 dn, 105 dn, 106 dn, 11 dn, 168 a, 169, 171, 171a, 173, 174a, 179, 180a, 215, 217 and 230 in bb loop and provision of new side pathway at br.nos 2,5,6 in nh-bdc section & tpkr fly over of howrah.
Strengthening of existing side pathway and replacement of corroded/perforated members like m.s chequered plate by ss antiskid chequred plates of gang way, side pathway, man refuse and tolly refuse of br. no.12 up, 20 up , 51 up, 83 up, 91 dn, 105 dn, 106 dn, 11 dn, 168 a, 169, 171, 171a, 173, 174a, 179, 180a, 215, 217 and 230 in bb loop and provision of new side pathway at br.nos 2,5,6 in nh-bdc section & tpkr fly over of howrah.
Read moreIchp- dismantling the existing damaged corroded floor chequered plates and ms channels and erection of new chequered plates and channels in conveyor-26a b take up floor.
Ichp- dismantling the existing damaged corroded floor chequered plates and ms channels and erection of new chequered plates and channels in conveyor-26a b take up floor.
Read moreTtps - ichp - dismantling the existing damaged stringer channel, structural members corroded chequered plates and erection of new stringer channel, structural members and chequered plates in conveyor 57.
Ttps - ichp - dismantling the existing damaged stringer channel, structural members corroded chequered plates and erection of new stringer channel, structural members and chequered plates in conveyor 57.
Read moreComplete dismantling, fabrication and fixing/erection of take-up pulley chequered floor area, side support structure ,take-up pulley frame, guide pipe/rails of conveyor 11c in amlohri chp phase-ii.
Complete dismantling, fabrication and fixing/erection
 of take-up pulley chequered floor area, side support
 structure ,take-up pulley frame, guide pipe/rails of
 conveyor 11c in amlohri chp phase-ii.
Read moreTtps- ichp-replacement of defective bend pulley with the available sh pulley in tripper of conveyor-59b
Ttps- ichp-replacement of defective bend pulley with the available sh pulley in tripper of conveyor-59b
Read moreTtps- ichp- providing of cold vulcanizing joints in 1400mm and 1800mm width conveyor belt in the stage-iii conveyor system.ttps- ichp- providing of cold vulcanizing joints in 1400mm and 1800mm width conveyor belt in the stage-iii conveyor system.
Ttps- ichp- providing of cold vulcanizing joints in 1400mm and 1800mm width conveyor belt in the stage-iii conveyor system.ttps- ichp- providing of cold vulcanizing joints in 1400mm and 1800mm width conveyor belt in the stage-iii conveyor system.ttps
Read moreIchp- dismantling of 600 mtrs. sh belt of size 1800mm belt width from conveyor-67 for further usage in conveyor-49 54.
Ichp- dismantling of 600 mtrs. sh belt of size 1800mm belt width from conveyor-67 for further usage in conveyor-49 54.&#x0d
Read moreof your Industry type