Tender Details
Particulars | Details |
---|---|
Title |
Complete Dismantling, Fabrication And Fixing/Erection Of Take Up Pulley Chequered Floor Area, Side Support Structure ,Take Up Pulley Frame, Guide Pipe/Rails Of Conveyor 11 C In Amlohri Chp Phase Ii.
|
Description |
Complete Dismantling, Fabrication And Fixing/Erection
Of Take Up Pulley Chequered Floor Area, Side Support
Structure ,Take Up Pulley Frame, Guide Pipe/Rails Of
Conveyor 11 C In Amlohri Chp Phase Ii.
|
Organisation | Northern Coalfields Limited | Central Govt. Ministry/Department |
Tender Id | 2024_NCL_783129_1 |
Reference Number |
AML/GM/ENM/QN/24/90 |
Tender Fee | 0 |
EMD | 2200 |
Tender Value | |
Place | Amlohri Project, NCL |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1087332 |
Start Date | December 27, 2024 17:30 |
End Date |
02/01/2025 ( Expired 128 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification/repairing of troughing/top idler frame of reclaim conveyor 3c1, 3c2, 4c1, 4c2 including complete fitting (1400 mm) and scrap to chp store section at chp phase-i, amlohri project.
Rectification/repairing of troughing/top idler frame of reclaim conveyor 3c1, 3c2, 4c1, 4c2 including complete fitting (1400 mm) and scrap to chp store section at chp phase-i, amlohri project.
Read moreDismantling fabrication and erection of roof structure and purlin at 0-605 conveyor and bulk handling area in ab b and s plant
Dismantling fabrication and erection of roof structure and purlin at 0-605 conveyor and bulk handling area in ab b and s plant
Read moreReplacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Read moreRepair, fabrication and erection of water supply main pipe line 8 inch dia near by back gate, welding of 6 inch dia gi pipe line near by water stock tank and new fitting of pipe line 2 inch dia from 80 b/c take-up drum to 00 level, dismantling and fi
Repair, fabrication and erection of water supply main pipe line 8 inch dia near by back gate, welding of 6 inch dia gi pipe line near by water stock tank and new fitting of pipe line 2 inch dia from 80 b/c take-up drum to 00 level, dismantling and fi
Read moreDismantling fabrication and erection and fitting of rom b/c, transfer b/c motor and gear box base frame structure repairing of fresh water er pipeline for water sprinkling in both side hopper, crusher inlet and in different locations in p.c.h sec
Dismantling fabrication and erection and fitting of rom b/c, transfer b/c motor and gear box base frame structure repairing of fresh water er pipeline for water sprinkling in both side hopper, crusher inlet and in different locations in p.c.h sec
Read moreComplete dismantling, fabrication and fixing/erection of take-up pulley chequered floor area, side support structure ,take-up pulley frame, guide pipe/rails of conveyor 11c in amlohri chp phase-ii.
Complete dismantling, fabrication and fixing/erection
 of take-up pulley chequered floor area, side support
 structure ,take-up pulley frame, guide pipe/rails of
 conveyor 11c in amlohri chp phase-ii.
Read moreTtps- ichp- dismantling the existing damaged corroded floor chequered plates and erection of new chequered plates in eastern side of conveyor-27a take up floor.
Ttps- ichp- dismantling the existing damaged corroded floor chequered plates and erection of new chequered plates in eastern side of conveyor-27a take up floor.
Read moreRepairing/ strengthening of base, guide frame, ladder and its supporting structure of take-up frame for unit 501-b belt conveyor of moonidih coal washery.
Repairing/ strengthening of base, guide frame, ladder and its supporting structure of take-up frame for unit 501-b belt conveyor of moonidih coal washery.
Read moreShifting of weightometer which includes dismantling, fabrication and erection of weightometer from 1019 conveyer to 1028 conveyor under chp-cpp, piparwar area.
Shifting of weightometer which includes dismantling, fabrication and erection of weightometer from 1019 conveyer to 1028 conveyor under chp-cpp, piparwar area.
Read moreRepairing of 02 nos conveyor loop take up drum of feeder breakerno-2 through dismantling, cutting, transporting, fabrication and fitting at nadkhurkee f/b of abocp mine, block-ii area
Repairing of 02 nos conveyor loop take up drum of feeder breakerno-2 through dismantling, cutting, transporting, fabrication and fitting at nadkhurkee f/b of abocp mine, block-ii area
Read moreof your Industry type