Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Complete Dismantling The 04 No. Lt Deflector Pulleys From Conveyor 12 C And 13 C, Shifting At Conveyor 10 C/11 C Conveyor Floor, Fabrication Of New Foundation Base In 10 C And 11 C Conveyors As Per Deflector Pulleys And Align The Conveyor As Per New Pulley
|
| Description |
Complete Dismantling The 04 No. Lt Deflector Pulleys From Conveyor 12 C And 13 C, Shifting At Conveyor 10 C/11 C Conveyor Floor, Fabrication Of New Foundation Base In 10 C And 11 C Conveyors As Per Deflector Pulleys And Align The Conveyor As Per New Pulley
|
| Organisation | Northern Coalfields Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_NCL_768397_1 |
|
Reference Number |
AML/GM/ENM/QN/24/84 |
| Tender Fee | 0 |
| EMD | 1900 |
| Tender Value | - |
| Place | Amlohri Project, NCL |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1072169 |
| Start Date | August 19, 2024 14:30 |
| End Date |
Expired
24/08/2024
Expired 785 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of conveyor deflector pulleys for chp 2x660mw ph 2 sstpp dongalia khandwa
Procurement of conveyor deflector pulleys for chp 2x660mw ph 2 sstpp dongalia khandwa
Read morePulley, deflector, f/tripper, pd/r-260507,pulley, drive, f/boom conveyor, pd/r-260508,pulley, drive
Read more
Pulley, deflector, f/tripper, pd/r-260507,pulley, drive, f/boom conveyor, pd/r-260508,pulley, drive
Read more
Procurement of conveyor pulleys on proprietary basis for belt conveyors working at jvr epc chp, sathupally area
Procurement of conveyor pulleys on proprietary basis for belt conveyors working at jvr epc chp, sathupally area.
Read moreProcurement of conveyor pulleys on specific make basis for belt conveyors working at jvr epc chp, sathupally area
Procurement of conveyor pulleys on specific make basis for belt conveyors working at jvr epc chp, sathupally area
Read moreComplete dismantling, fabrication and fixing/erection of take-up pulley chequered floor area, side support structure ,take-up pulley frame, guide pipe/rails of conveyor 11c in amlohri chp phase-ii.
Complete dismantling, fabrication and fixing/erection
 of take-up pulley chequered floor area, side support
 structure ,take-up pulley frame, guide pipe/rails of
 conveyor 11c in amlohri chp phase-ii.
Read moreComplete repairing of 02 nos. of drive pulley (dia 650x1400mm) of unit no. 121 a and b belt conveyors and 04 nos. non-drive pulleys (dia 650x1150mm) of unit no. 415 and 307 belt conveyors main plant of kedla washery
Complete repairing of 02 nos. of drive pulley (dia 650x1400mm) of unit no. 121 a and b belt conveyors and 04 nos. non-drive pulleys (dia 650x1150mm) of unit no. 415 and 307 belt conveyors main plant of kedla washery
Read moreTggenco-ktps-vii stage-chp/mm,mcpfo-procurement of adhesives for conveyor belt joints, pulley lagging and patch works for the conveyors-quotation called for-regarding
Procurement of adhesives for conveyor belt joints, pulley lagging and patch works for the conveyors
Read moreHot jointing through splicing and hot vulcanization, hot patch of 1600 mm and 1400 mm steel cord belt, cold jointing of 1400 mm and 1000 mm pn belt, cold patch repair of all conveyors and pulley lagging of various drum pulleys in different conveyors
Hot jointing through splicing and hot vulcanization, hot patch of 1600 mm and 1400 mm steel cord belt, cold jointing of 1400 mm and 1000 mm pn belt, cold patch repair of all conveyors and pulley lagging of various drum pulleys in different conveyors
Read moreSteel structural work for complete dismantling, fabrication and erection of deck sheets, chequered plates with supporting structure along with foundation strengthening in crusher house, conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii
Steel structural work for complete dismantling, fabrication and erection of deck sheets,chequered plates with supporting structure along with foundation strengthening in crusher house,conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii
Read moreof your Industry type