Tender Details

Particulars Details
Title
Complete Dismantling The 04 No. Lt Deflector Pulleys From Conveyor 12 C And 13 C, Shifting At Conveyor 10 C/11 C Conveyor Floor, Fabrication Of New Foundation Base In 10 C And 11 C Conveyors As Per Deflector Pulleys And Align The Conveyor As Per New Pulley
Description
Complete Dismantling The 04 No. Lt Deflector Pulleys From Conveyor 12 C And 13 C, Shifting At Conveyor 10 C/11 C Conveyor Floor, Fabrication Of New Foundation Base In 10 C And 11 C Conveyors As Per Deflector Pulleys And Align The Conveyor As Per New Pulley
Organisation Northern Coalfields Limited | Central Govt. Ministry/Department
Tender Id 2024_NCL_768397_1
Reference
Number
AML/GM/ENM/QN/24/84
Tender Fee 0
EMD 1900
Tender Value -
Place Amlohri Project, NCL
Link
View Original Tender Notice

https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1072169

Start Date August 19, 2024 14:30
End Date
Expired 24/08/2024

Expired 764 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Procurement of conveyor deflector pulleys for chp 2x660mw ph 2 sstpp dongalia khandwa

Procurement of conveyor deflector pulleys for chp 2x660mw ph 2 sstpp dongalia khandwa

Read more
Procurement of conveyor pulleys on proprietary basis for belt conveyors working at jvr epc chp, sathupally area

Procurement of conveyor pulleys on proprietary basis for belt conveyors working at jvr epc chp, sathupally area.

Read more
Procurement of conveyor pulleys on specific make basis for belt conveyors working at jvr epc chp, sathupally area

Procurement of conveyor pulleys on specific make basis for belt conveyors working at jvr epc chp, sathupally area

Read more
Providing and fixing of conveyor pre- alarms/sirens at silent zones along p1q1r1 and p2q2r2 conveyors of new chp, dep.

Providing and fixing of conveyor pre- alarms/sirens at silent zones along p1q1r1 and p2q2r2 conveyors of new chp, dep.

Read more
Transporting, shifting of old conveyor drums with new drums and transporting, shifting of old belt conveyors and changing of new belt conveyors and shifting of scrap material pch to store and iron steel (joist, angle, channel, pates) materials from s

Transporting, shifting of old conveyor drums with new drums and transporting, shifting of old belt conveyors and changing of new belt conveyors and shifting of scrap material pch to store and iron steel (joist, angle, channel, pates) materials from s

Read more
Steel structural work for complete dismantling, fabrication and erection of deck sheets, chequered plates with supporting structure along with foundation strengthening in crusher house, conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii

Steel structural work for complete dismantling, fabrication and erection of deck sheets,chequered plates with supporting structure along with foundation strengthening in crusher house,conveyor 8c,9c,10c,11c,1c and 2c in chp phase-i and phase-ii

Read more
Repairing of different pulleys of size 1800mm/1400mm x 1250mm/1000mm/800mm/630mm/ 273mm for 1600mm and 1200mm wide conveyor belts of new chp and silo at dipka expansion project.

Repairing of different pulleys of size 1800mm/1400mm x 1250mm/1000mm/800mm/630mm/ 273mm for 1600mm and 1200mm wide conveyor belts of new chp and silo at dipka expansion project.

Read more
Preparatory job for carrying out hot joints in steel cord conveyor belts and replacement of steel cord belt in the conveyors for a period of 365 days at new silo, bocp.

Preparatory job for carrying out hot joints in steel cord conveyor belts and replacement of steel cord belt in the conveyors for a period of 365 days at new silo, bocp.

Read more
Preparatory job for carrying out hot joints in steel cord conveyor belts and replacement of steel cord belt in the conveyors as and when required for a period of 365days at new silo, bocp.

Preparatory job for carrying out hot joints in steel cord conveyor belts and replacement of steel cord belt in the conveyors as and when required for a period of 365days at new silo, bocp.

Read more
The rep. work of different spares of conveyor pulleys, repairing/machining of crusher rotor shaft and fab./mach. and ht of i/p shaft and matching bevel gear of boom conv. and bucket gear box of old/new s/r,chp, btps, obra.

The rep. work of different spares of conveyor pulleys, repairing/machining of crusher rotor shaft and fab./mach. and ht of i/p shaft and matching bevel gear of boom conv. and bucket gear box of old/new s/r,chp, btps, obra.

Read more
Click Here to Download Dockets