Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of Snub Drum Pulley Of Conveyor 1017 Near Head End By Means Of Demounting The Pulley, Dismantling Damaged Bearing With Sleeve, Providing And Fixing Of Bearing With Sleeve And Oil Seal To The Snub Drum Pulley And Remounting The Snub Drum P
|
Description |
Repairing Of Snub Drum Pulley Of Conveyor 1017 Near Head End By Means Of Demounting The Pulley, Dismantling Damaged Bearing With Sleeve, Providing And Fixing Of Bearing With Sleeve And Oil Seal To The Snub Drum Pulley And Remounting The Snub Drum P
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_303331_1 |
Reference Number |
PE/Mech./CHP/PPR/23-24/23 |
Tender Fee | 0 |
EMD | 1500 |
Tender Value | |
Place | OFFICE OF PO CHP-CPP, Piparwar Area, CCL |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=314216 |
Start Date | March 01, 2024 22:30 |
End Date |
09/03/2024 ( Expired 456 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
(a) dismantling of drum and equalization pinion with guard and refitting of drum after changing of f/b no.4 (b) repairing and reassembling of broken chain conveyor of f/b no-4 and (c) replacement of defective motor of f/b no-5 of amp colliery.
(a) dismantling of drum and equalization pinion with guard and refitting of drum after changing of f/b no.4 (b) repairing and reassembling of broken chain conveyor of f/b no-4 and (c) replacement of defective motor of f/b no-5 of amp colliery.
Read moreClubbed work (1) demounting, removing of deteriorated stringers with rollers, fitting and welding of new stringers with rollers to different 1400 mm conveyor belts under chp-cpp, piparwar area,(2) cutting, dismantling, demounting, repairing, position
Clubbed work (1) demounting, removing of deteriorated stringers with rollers, fitting and welding of new stringers with rollers to different 1400 mm conveyor belts under chp-cpp, piparwar area,(2) cutting, dismantling, demounting, repairing, position
Read moreRepairing/ prive maintenance of damaged portion of structure and repairing of tailend drum along with structure of conveyor belt rc-5 at bhojudih coal washery.
Repairing/ prive maintenance of damaged portion of structure and repairing of tailend drum along with structure of conveyor belt rc-5 at bhojudih coal washery.
Read moreThe work of repairing / strengthening of base structure for drive system (gearbox, motor, drive drum and snub drum) including their supporting structure along with its alignment and repairing of its change-over gate for unit 502 belt conveyor at mnd
The work of repairing / strengthening of base structure for drive system (gearbox, motor, drive drum and snub drum) including their supporting structure along with its alignment and repairing of its change-over gate for unit 502 belt conveyor at mnd
Read moreDismantling the damaged roof and side wall, straightening these into the original shape and fitting of these with machine by front fixing with bolt and nuts etc m/c sl. no. 613 of abocp
Dismantling the damaged roof and side wall, straightening these into the original shape and fitting of these with machine by front fixing with bolt and nuts etc m/c sl. no. 613 of abocp
Read more1.rep of complete oil cooler tube welding, gauging, cleaning with dismantling, mounting and repair work of all front, fitment work of drill. no. 936. 2.repairing of damaged pto opening, dismantling and re-assembling drill sl. no.853.
1.rep of complete oil cooler tube welding, gauging, cleaning with dismantling, mounting and repair work of all front, fitment work of drill. no. 936. 2.repairing of damaged pto opening, dismantling and re-assembling drill sl. no.853.
Read moreDismantling, repairing and replacement of damaged/ worn-out gear coupling, along with re-alignment and re-fitting of gear box of unit 402 conveyor at moonidih coal washery
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, along with re-alignment and re-fitting of gear box of unit 402 conveyor at moonidih coal washery
Read moreDismantling, repairing and replacement of bearing and alignment of gear box model gs-100 installed at drive drum of unit 701 conveyor belt at moonidih coal washery.
Dismantling, repairing and replacement of bearing and alignment of gear box model gs-100 installed at drive drum of unit 701 conveyor belt at moonidih coal washery.
Read moreRepairing and necessary spares changing i.e.rear front brake shoe,u.j.cross, releasing bearing, clutch plate oil seal,operator seat rep with rexin foam rope,new frontglass with rubber and other misc.work of service van jh10v 7601 of muraidih,ampc.
Repairing and necessary spares changing i.e.rear front brake shoe,u.j.cross, releasing bearing, clutch plate oil seal,operator seat rep with rexin foam rope,new frontglass with rubber and other misc.work of service van jh10v 7601 of muraidih,ampc.
Read moreRepairing/new change of complete shaft tail end pulley of 2x110kw of belt tc03 vishwa conveyor and change shell of snub pulley of tc03 and tc02 belt conveyor of ccs of moonidih underground mine. sl.no. 524/07,517/01,517/02
Repairing/new change of 
 complete shaft tail end pulley 
 of 2x110kw of belt tc03 
 vishwa conveyor and change 
 shell of snub pulley of tc03 
 and tc02 belt conveyor of 
 ccs of moonidih 
 underground mine. sl.no. 
 524/07,517/01,517/02
Read moreof your Industry type