Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
1).Rebuilding Of 100 No. Internal Teeth Of 02 No. Pinion Gears For Primary Crusher 2101 Running, 2) Repairing Of Tail End Drum Pulley Of Conveyor 1027 By Means Of Demounting Of Drum Pulley, Dismantling Of Damaged Bearing With Sleeve, Mounting Of New
|
| Description |
1).Rebuilding Of 100 No. Internal Teeth Of 02 No. Pinion Gears For Primary Crusher 2101 Running, 2) Repairing Of Tail End Drum Pulley Of Conveyor 1027 By Means Of Demounting Of Drum Pulley, Dismantling Of Damaged Bearing With Sleeve, Mounting Of New
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_315043_1 |
|
Reference Number |
PE/Mech./CHP/PPR/24-25/05 |
| Tender Fee | 0 |
| EMD | 6000 |
| Tender Value | - |
| Place | OFFICE OF PO CHP-CPP, Piparwar Area, CCL |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=326484 |
| Start Date | August 13, 2024 22:30 |
| End Date |
Expired
22/08/2024
Expired 784 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of snub drum pulley of conveyor 1017 near head end by means of demounting the pulley, dismantling damaged bearing with sleeve, providing and fixing of bearing with sleeve and oil seal to the snub drum pulley and remounting the snub drum p
Repairing of snub drum pulley of conveyor 1017 near head end by means of demounting the pulley, dismantling damaged bearing with sleeve, providing and fixing of bearing with sleeve and oil seal to the snub drum pulley and remounting the snub drum p
Read moreDemounting, dismantling, repairing, re-assembling, fitment and testing of gear box of primary crusher 2101 under chp-cpp, ppr
Demounting, dismantling, repairing, re-assembling, fitment and testing of gear box of primary crusher 2101 under chp-cpp, ppr
Read moreCasting, machining and rebuilding of 02 nos. of aluminum jaw coupling for primary crusher 2101 under chp-cpp,piparwar.
Casting, machining and rebuilding of 02 nos. of aluminum jaw coupling for primary crusher 2101 under chp-cpp,piparwar.
Read moreDemounting, dismantling, repairing of input shaft, rebuilding and line boring of 1st and 2nd mount bearing seats, pressing of bearings, reassembling, fitment and testing of complete gear box assembly of primary crusher 2101 under chp/cpp, piparwar ar
Demounting, dismantling, repairing of input shaft, rebuilding and line boring of 1st and 2nd mount bearing seats, pressing of bearings, reassembling, fitment and testing of complete gear box assembly of primary crusher 2101 under chp/cpp, piparwar ar
Read more85 teeth helical gear,pinion 18 teeth en24 w s hft 246 mm,main shaft mahashakti drum,pulley bevel c
Read more
Repairing and replacement of 02 nos. drive pulley drum, shell and shaft of 215 impact crusher at hms section of kathara washery
Repairing and replacement of 02 nos. drive pulley drum, shell and shaft of 215 impact crusher at hms section of kathara washery
Read moreRepairing and rebuilding of 42 nos teeth of 3 nos swing rack pinion and 53 nos. teeth with both side bore of 1 no crowd drum assembly of be195 shovel working at bina project.
Repairing and rebuilding of 42 nos teeth of 3 nos swing rack pinion and 53 nos. teeth with both side bore of 1 no crowd drum assembly of be195 shovel working at bina project.
Read moreRepairing/replacement of (02 nos.) drive pulley drum repair in shell and shaft of 215 impact crusher in hms section at kathara washery
Repairing/replacement of (02 nos.) drive pulley drum repair in shell and shaft of 215 impact crusher in hms section at kathara washery
Read moreDemounting, repairing, pressing and fitment work of bearing, sleeve and bearing block on discharge drum pulley, and repairing of discharge end structure of boom conveyor of stacker 2 under chp-cpp, piparwar area.
Demounting, repairing, pressing and fitment work of bearing, sleeve and bearing block on discharge drum pulley, and repairing of discharge end structure of boom conveyor of stacker 2 under chp-cpp, piparwar area.
Read moreRe-handling of spilled raw coal/slurry accumulated from head drum to tail drum, and around the take-up pulley of 133a and ground floor of secondary crusher house of pre-washery at kedla washery
Re-handling of spilled raw coal/slurry accumulated from head drum to tail drum, and around the take-up pulley of 133a and ground floor of secondary crusher house of pre-washery at kedla washery
Read moreof your Industry type