Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Demounting, Repairing, Pressing And Fitment Work Of Bearing, Sleeve And Bearing Block On Discharge Drum Pulley, And Repairing Of Discharge End Structure Of Boom Conveyor Of Stacker 2 Under Chp Cpp, Piparwar Area.
|
| Description |
Demounting, Repairing, Pressing And Fitment Work Of Bearing, Sleeve And Bearing Block On Discharge Drum Pulley, And Repairing Of Discharge End Structure Of Boom Conveyor Of Stacker 2 Under Chp Cpp, Piparwar Area.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_283459_1 |
|
Reference Number |
PE(Mech.)/CHP/e-NIT/23-24/07 |
| Tender Fee | - |
| EMD | 1200 |
| Tender Value | - |
| Place | OFFICE OF PO CHP-CPP, Piparwar Area, CCL |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | July 13, 2023 16:30 |
| End Date |
Expired
21/07/2023
Expired 1184 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of walkways and platform of boom pulley assy. of 7820 dragline and fabrication and fitment of side collars of drag and hoist rope drum of 7820 dragline.
Repairing of walkways and platform of boom pulley assy. of 7820 dragline and fabrication and fitment of side collars of drag and hoist rope drum of 7820 dragline.
Read more10360877 lv8ussrkvdt9 gost 572075a bearing 1200,10361302 lv8ussrkvdt9 ty3700356377 sound signal without horn c3ii,10361263 lv8ussrkvdt9 tu1653615180a terminal block kb1017,10355290 lv8ussrkvdt9 08000038a tie rod,10356144 lv8ussrkvdt9 03000407a cover,10361804 lv8ussrkvdt9 gost 687475b bearing 8110,10355004 lv8ussrkvdt9 030005url winch,10354773 lv8ussrkvdt4 1100017 aviation canvas,10355701 lv8ussrkvdt4 40334619072 cylinder cover,10354969 lv8ussrkvdt9 008002 holf cupling shaft,10361887 lv8ussrkvdt9 gost33379b bearing 7214,10361022 lv8ussrkvdt9 a0320 pinion,10355365 lv8ussrkvdt4 19000008 gear,10361010 lv8ussrkvdt9 a03203 roller shaft,10361836 lv8ussrkvdt9 gost 802675 bearing 32205,10366950 lv8ussrkvdt4 gost33371 a bearing no 7524,10360974 lv8ussrkvdt9 a04039 b brake housing,10361061 lv8ussrkvdt4 40334637020b cylinder body,10360713 lv8ussrkvdt4 4033b4610034 post tube,10361822 lv8ussrkvdt9 gost 687475ural bearing 5210,10355261 lv8ussrkvdt9 06020 mobile boom,10355767 lv8ussrkvdt9 003017 pressing shaft,10367118 lv8us
10360877 lv8ussrkvdt9 gost 572075a bearing 1200,10361302 lv8ussrkvdt9 ty3700356377 sound signal without horn c3ii,10361263 lv8ussrkvdt9 tu1653615180a terminal block kb1017,10355290 lv8ussrkvdt9 08000038a tie rod,10356144 lv8ussrkvdt9 03000407a cover,10361804 lv8ussrkvdt9 gost 687475b bearing 8110,10355004 lv8ussrkvdt9 030005url winch,10354773 lv8ussrkvdt4 1100017 aviation canvas,10355701 lv8ussrkvdt4 40334619072 cylinder cover,10354969 lv8ussrkvdt9 008002 holf cupling shaft,10361887 lv8ussrkvdt9 gost33379b bearing 7214,10361022 lv8ussrkvdt9 a0320 pinion,10355365 lv8ussrkvdt4 19000008 gear,10361010 lv8ussrkvdt9 a03203 roller shaft,10361836 lv8ussrkvdt9 gost 802675 bearing 32205,10366950 lv8ussrkvdt4 gost33371 a bearing no 7524,10360974 lv8ussrkvdt9 a04039 b brake housing,10361061 lv8ussrkvdt4 40334637020b cylinder body,10360713 lv8ussrkvdt4 4033b4610034 post tube,10361822 lv8ussrkvdt9 gost 687475ural bearing 5210,10355261 lv8ussrkvdt9 06020 mobile boom,10355767 lv8ussrkvdt9 003017 pressing shaft,10367118 lv8us
Read moreDemounting, dismantling, repairing, reassembling and fitment work of gear box kza 360 of 1020 conveyor under chp-cpp,piparwar area.
Demounting, dismantling, repairing, reassembling and fitment work of gear box kza 360 of 1020 conveyor under chp-cpp,piparwar area.
Read moreDemounting, dismantling, repairing of input shaft, rebuilding and line boring of 1st and 2nd mount bearing seats, pressing of bearings, reassembling, fitment and testing of complete gear box assembly of primary crusher 2101 under chp/cpp, piparwar ar
Demounting, dismantling, repairing of input shaft, rebuilding and line boring of 1st and 2nd mount bearing seats, pressing of bearings, reassembling, fitment and testing of complete gear box assembly of primary crusher 2101 under chp/cpp, piparwar ar
Read moreIchp- replacing the tripper discharge pulley bearing with new/sh bearing in stacker-i ii machines.
Ichp- replacing the tripper discharge pulley bearing with new/sh bearing in stacker-i ii machines.&#x0d
Read moreIchp- replacing the tripper discharge pulley bearing with new sh bearing in stacker i ii machines.
Ichp- replacing the tripper discharge pulley bearing with new sh bearing in stacker i ii machines.
Read moreIchp-reconditioning of tripper discharge pulley released from stacker machine
Ichp-reconditioning of tripper discharge pulley released from stacker machine
Read moreProcument of stacker bogie and take up pulley of boom conveyor
Procument of stacker bogie and take up pulley of boom conveyor
Read moreDemounting, dismantling, repairing, reassembling, fitting and testing of scraper blade assembly of reclaimer-i under chp-cpp, piparwar area
Demounting, dismantling, repairing, reassembling, fitting and testing of scraper blade assembly of reclaimer-i under chp-cpp, piparwar area
Read moreRepair of boom conveyor tail pulley of stacker cum reclaimer at chp
Repair of boom conveyor tail pulley of stacker cum reclaimer at chp
Read moreof your Industry type