Tender Details

Particulars Details
Title
Demounting, Dismantling, Repairing Of Input Shaft, Rebuilding And Line Boring Of 1st And 2nd Mount Bearing Seats, Pressing Of Bearings, Reassembling, Fitment And Testing Of Complete Gear Box Assembly Of Primary Crusher 2101 Under Chp/Cpp, Piparwar Ar
Description
Demounting, Dismantling, Repairing Of Input Shaft, Rebuilding And Line Boring Of 1st And 2nd Mount Bearing Seats, Pressing Of Bearings, Reassembling, Fitment And Testing Of Complete Gear Box Assembly Of Primary Crusher 2101 Under Chp/Cpp, Piparwar Ar
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_335979_1
Reference
Number
PE/Mech/CHP/PPR/e-NIT/25-26/01
Tender Fee 0
EMD 9000
Tender Value
Place OFFICE OF PO CHP-CPP, Piparwar Area, CCL
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=348271
Start Date May 22, 2025 22:30
End Date

02/06/2025 ( Expired 10 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Clubbed work (1) demounting, removing of deteriorated stringers with rollers, fitting and welding of new stringers with rollers to different 1400 mm conveyor belts under chp-cpp, piparwar area,(2) cutting, dismantling, demounting, repairing, position

Clubbed work (1) demounting, removing of deteriorated stringers with rollers, fitting and welding of new stringers with rollers to different 1400 mm conveyor belts under chp-cpp, piparwar area,(2) cutting, dismantling, demounting, repairing, position

Read more
Demounting crusher roll with dismantling of gear box, bearing block, input shaft, fluid coupling, hollow shaft and fitment of all assy. of elecon feeder breaker no. 01 under dakra project, nk area

Demounting crusher roll with dismantling of gear box, bearing block, input shaft, fluid coupling, hollow shaft and fitment of all assy. of elecon feeder breaker no. 01 under dakra project, nk area

Read more
Making hollow shaft cover, input shaft covers, intermediate shaft cover, steel coupling and coupling bolt, nut and rubber bush of crusher gear box of elecon feeder breaker of dakra ocp, nk area

Making hollow shaft cover, input shaft covers, intermediate shaft cover, steel coupling and coupling bolt, nut and rubber bush of crusher gear box of elecon feeder breaker of dakra ocp, nk area

Read more
Repairing/rewinding of 02 no. 150 kw, squirrel cage induction motor with volt 3.3 kv make toshiba rpm 1440 sr.no. 30048860m and sr.no. 30048861m installed at 2104 secondary and 2101 primary crusher under chp/cpp,ppr.

Repairing/rewinding of 02 no. 150 kw, squirrel cage induction motor with volt 3.3 kv make toshiba rpm 1440 sr.no. 30048860m and sr.no. 30048861m installed at 2104 secondary and 2101 primary crusher under chp/cpp,ppr.

Read more
Demounting, dismantling, repairing of input shaft, rebuilding and line boring of 1st and 2nd mount bearing seats, pressing of bearings, reassembling, fitment and testing of complete gear box assembly of primary crusher 2101 under chp/cpp, piparwar ar

Demounting, dismantling, repairing of input shaft, rebuilding and line boring of 1st and 2nd mount bearing seats, pressing of bearings, reassembling, fitment and testing of complete gear box assembly of primary crusher 2101 under chp/cpp, piparwar ar

Read more
Welding and co-axial boring of 3rd intermediate shaft outer bearing housing and 3rd intermediate shaft bearing housing and 2nd intermediate shaft bearing housing both side of 2 nos. propel gear box assembly.

Welding and co-axial boring of 3rd intermediate shaft outer bearing housing and 3rd intermediate shaft bearing housing and 2nd intermediate shaft bearing housing both side of 2 nos. propel gear box assembly.

Read more
Repairing of input shaft and intermediate pinion shaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma

Repairing of input shaft and intermediate pinion shaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma

Read more
Replacement of bushing and boring of housing of crowd shipper shaft,rebuilding of both sides wornout portion collar plate seats along with fitment of fabricated collar of both sides and repairing of the cracked crowd gearbox housing of p and h shovel

Replacement of bushing and boring of housing of crowd shipper shaft,rebuilding of both sides wornout portion collar plate seats along with fitment of fabricated collar of both sides and repairing of the cracked crowd gearbox housing of p and h shovel

Read more
Overhauling of complete swing gear box assembly along with rack and pinion, repairing of damaged walkway, platform, handrails of stacker ii under chp/cpp, piparwar area.

Overhauling of complete swing gear box assembly along with rack and pinion, repairing of damaged walkway, platform, handrails of stacker ii under chp/cpp, piparwar area.

Read more
Clubbed work (1) repairing, spare changing, servicing of complete assembly of hydraulic huck bolting machine 940-220 of chp and (2) gear box side drive shaft 01 no. damaged bearing replacement of conveyor 1020 under chp-cpp, piparwar.

Clubbed work (1) repairing, spare changing, servicing of complete assembly of hydraulic huck bolting machine 940-220 of chp and (2) gear box side drive shaft 01 no. damaged bearing replacement of conveyor 1020 under chp-cpp, piparwar.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise