Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Demounting, Dismantling, Repairing, Re Assembling, Fitment And Testing Of Complete Assembly Of Gear Box Kza 360 Of Conveyor 1018 Under Chp Cpp, Ppr.
|
Description |
Demounting, Dismantling, Repairing, Re Assembling, Fitment And Testing Of Complete Assembly Of Gear Box Kza 360 Of Conveyor 1018 Under Chp Cpp, Ppr.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_321231_1 |
Reference Number |
PE/Mech/CHP/PPR/e-NIT/24-25/11 |
Tender Fee | 0 |
EMD | 4100 |
Tender Value | |
Place | OFFICE OF PO CHP-CPP, Piparwar Area, CCL |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=332977 |
Start Date | November 15, 2024 22:30 |
End Date |
25/11/2024 ( Expired 225 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of repairing of m/s elecon make gear boxes installed in conveyor system and apron feeders of chp-iv, stps, mppgcl, sarni.
Work of repairing of m/s elecon make gear boxes installed in conveyor system and apron feeders of chp-iv, stps, mppgcl, sarni. &#x0d
Read moreRe-winding of 3 phase submersible motor of different hp and repairing of submersible pump bowl assembly suitable of different make at various locations under barasat ai division during 2025 2026
Re-winding of 12.5 h.p. to 20 h.p. 3 phase submersible motor of different make and repairing of submersible pump bowl assembly suitable for capacity of 200 cum./hr. under habra (ai) sub-division under barasat (ai) division during 2025-26.
Read moreMtps i mill plant unit iv complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in 4a to 4f
Mtps i mill plant unit iv complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in 4a to 4f
Read moreService contract for repairing and servicing of esp rapping system gear box, stg-i and stg-ii esp, under ahp(em) at sgtpp, wbpdcl.
Service contract for repairing and servicing of esp rapping system gear box, stg-i and stg-ii esp, under ahp(em) at sgtpp, wbpdcl.
Read moreInstallation of sky-net type lightning arrestors at different weighbridges and rfid entry-exit gates under chp-cpp, ppr.
Installation of sky-net type lightning arrestors at different weighbridges and rfid entry-exit gates under chp-cpp, ppr.
Read moreRepairing of bucket assembly and changing of 08 nos. tooth point, repairing of adaptor by welding, grinding, along with repairing of edge segment, fabrication of battery box, ladder new making, transmission guard fabrication and dismantling, overhaul
Repairing of bucket assembly and changing of 08 nos. tooth point, repairing of adaptor by welding, grinding, along with repairing of edge segment, fabrication of battery box, ladder new making, transmission guard fabrication and dismantling, overhaul
Read moreA)repairing and thorough overhauling of gear box gs-50 of unit no. 929 belt conveyor and (b)repair, replacement and changing of gs-14a type gear box chain sprocket and drum side sprocket of new bunker washed coal power in rlb section of kathara washe
A)repairing and thorough overhauling of gear box gs-50 of unit no. 929 belt conveyor and (b)repair, replacement and changing of gs-14a type gear box chain sprocket and drum side sprocket of new bunker washed coal power in rlb section of kathara washe
Read moreDemounting and fitment of under carriage assembly of 01 no. bd355 dozer sl. no. g-11730 of khadia project
Demounting and fitment of under carriage assembly of 01 no. bd355 dozer sl. no. g-11730 of khadia project
Read more(a)complete repairing and overhauling of (02 nos.) magnetic separator drum assembly of unit no. 220 and 222 and (b)repairing and overhauling of (03 nos.) motorized gear box of unit no. 218, 220 and 222 in hms section of kathara washery
(a)complete repairing and overhauling of (02 nos.) magnetic separator drum assembly of unit no. 220 and 222 and (b)repairing and overhauling of (03 nos.) motorized gear box of unit no. 218, 220 and 222 in hms section of kathara washery
Read moreRepairing of complete engine, gear box, fuel pump, brake system and steering system of ace 12t crane sl.no. mc-554 of gidi-a project.
Repairing of complete engine, gear box, fuel pump, brake system and steering system of ace 12t crane sl.no. mc-554 of gidi-a project.
Read moreof your Industry type