Tender Details
Particulars | Details |
---|---|
Title |
Replacement Of Take Up Pulley Drum Assembly And Bend Pulley Drum Assembly After Dismantling Of Existing Worn Out Drum For Unit 701 Belt Conveyor And Refitting Of All Its Accessories At Moonidih Coal Washery.
|
Description |
Replacement Of Take Up Pulley Drum Assembly And Bend Pulley Drum Assembly After Dismantling Of Existing Worn Out Drum For Unit 701 Belt Conveyor And Refitting Of All Its Accessories At Moonidih Coal Washery.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2024_BCCL_319919_1 |
Reference Number |
BCCL/PO/MND/EnM/E -Tender/2024-25/E 949 |
Tender Fee | 0 |
EMD | 5300 |
Tender Value | |
Place | MOONIDIH WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331622 |
Start Date | October 28, 2024 14:30 |
End Date |
04/11/2024 ( Expired 218 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing/ strengthening of bypass chute for unit 901 after dismantling of existing worn-out chute with its side skirts, shaft, rack and pinion of gate at moonidih coal washery.
Repairing/ strengthening of bypass chute for unit 901 after dismantling of existing worn-out chute with its side skirts, shaft, rack and pinion of gate at moonidih coal washery.
Read moreRe-fabrication and installation of cable tray of unit 702 conveyor gallery (120 meter length) at moonidih coal washery.
Re-fabrication and installation of cable tray of unit 702 conveyor gallery (120 meter length) at moonidih coal washery.
Read moreReplacement of 1400mm wide conveyor belt in unit 502, 105, 201 n 1000mm wide belt conveyor in unit 801-a and replacement of damaged conveyor belting pieces at different belt conveyors under section-v (as and when required) at moonidih coal washery.
Replacement of 1400mm wide conveyor belt in unit 502, 105, 201 n 1000mm wide belt conveyor in unit 801-a and replacement of damaged conveyor belting pieces at different belt conveyors under section-v (as and when required) at moonidih coal washery.
Read moreNctps i operation ca rwph dismantling the existing worn out damaged reject water ms erw pipe line 100 nb and erection of mild steel electric resistance welded 100nb new ms erw pipes and bend from ro stream to reject water tank dismantling the existin
Nctps i operation ca rwph dismantling the existing worn out damaged reject water ms erw pipe line 100 nb and erection of mild steel electric resistance welded 100nb new ms erw pipes and bend from ro stream to reject water tank dismantling the existin
Read more(a) dismantling of drum and equalization pinion with guard and refitting of drum after changing of f/b no.4 (b) repairing and reassembling of broken chain conveyor of f/b no-4 and (c) replacement of defective motor of f/b no-5 of amp colliery.
(a) dismantling of drum and equalization pinion with guard and refitting of drum after changing of f/b no.4 (b) repairing and reassembling of broken chain conveyor of f/b no-4 and (c) replacement of defective motor of f/b no-5 of amp colliery.
Read morePrive maintenance and repair of extended reject / wpc belt conveyor and its take up unit of bhojudih coal washery.
Prive maintenance and repair of extended reject / wpc belt conveyor and its take up unit of bhojudih coal washery.
Read moreRepairing , replacement and maintenance of drive unit , driven drum structure , side plates carrying rollers and rollers of conveyor gathering belt no. 1 of preparation plant at bhojudih coal washery.
Repairing , replacement and maintenance of drive unit , driven drum structure , side plates carrying rollers and rollers of conveyor gathering belt no. 1 of preparation plant at bhojudih coal washery.
Read moreRepairing/ strengthening of approaching stair case and its support for stairs going up to unit 502, c-1 and c-2 conveyor belt at moonidih coal washery.
Repairing/ strengthening of approaching stair case and its support for stairs going up to unit 502, c-1 and c-2 conveyor belt at moonidih coal washery.
Read moreFabrication and installation of new slider frame after dismantling and removal of existing worn-out slider of slidding pulley of unit c-1 and c-2 belt conveyor at moonidih coal washery.
Fabrication and installation of new slider frame after dismantling and removal of existing worn-out slider of slidding pulley of unit c-1 and c-2 belt conveyor at moonidih coal washery.
Read moreReplacement of block bearings at different belt conveyor drums after dismantling of out of order blocks bearings from drums at lhcm1 district of 3n4 incline, j.p.colly.
Replacement of block bearings at different belt conveyor drums after dismantling of out of order blocks bearings from drums at lhcm1 district of 3n4 incline, j.p.colly.
Read moreof your Industry type