Tender Details
Particulars | Details |
---|---|
Title |
Replacement Of 2 Nos. Of Snub Drum Assembly After Dismantling Of Existing Worn Out Drum For Unit C 1 Belt Conveyor And Refitting Of All Its Accessories At Moonidih Coal Washery.
|
Description |
Replacement Of 2 Nos. Of Snub Drum Assembly After Dismantling Of Existing Worn Out Drum For Unit C 1 Belt Conveyor And Refitting Of All Its Accessories At Moonidih Coal Washery.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 5400 |
Tender Value | |
Place | MOONIDIH WASHERY |
Link |
AAAAAAAAAA Login to view |
Start Date | May 19, 2025 14:30 |
End Date |
26/05/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.
Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.
Read moreInstallation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 504 belt conveyors at moonidih coal washery.
Installation of new brackets and rollers after dismantling, existing damaged pieces along with modification of their base for unit 504 belt conveyors at moonidih coal washery.
Read moreMaking and fitting of er weight assembly in unit 701 and 702 conveyor belt and refitting of all its accessories at moonidih coal washery.
Making and fitting of er weight assembly in unit 701 and 702 conveyor belt and refitting of all its accessories at moonidih coal washery.
Read moreNctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Nctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Read moreRepairing/ strengthening of base structure and other supporting structures for drive system (drive drum, snub drum, gear box and motor) of 403-a belt conveyor at moonidih coal washery.
Repairing/ strengthening of base structure and other supporting structures for drive system (drive drum, snub drum, gear box and motor) of 403-a belt conveyor at moonidih coal washery.
Read moreThe work of repairing / strengthening of base structure for drive system (gearbox, motor, drive drum and snub drum) including their supporting structure along with its alignment and repairing of its change-over gate for unit 502 belt conveyor at mnd
The work of repairing / strengthening of base structure for drive system (gearbox, motor, drive drum and snub drum) including their supporting structure along with its alignment and repairing of its change-over gate for unit 502 belt conveyor at mnd
Read moreRemoval of coal/shale debris below belt conveyor (all existing belt at ug) at chhatarpur mine no.1, pathakhera area, wcl
Removal of coal/shale debris below belt conveyor (all existing belt at ug) at chhatarpur mine no.1, pathakhera area, wcl
Read morePatch welding to be done for rectification of damaged flue gas duct from aph-b hopper to chimeny along the path cd side flue gas duct and its honeycomb structure ( cd) after dismantling the damaged / worn out portion of flue gas ducts for overhaul of unit ix
Patch welding to be done for rectification of damaged flue gas duct from aph b hopper to chimeny along the path cd side flue gas duct and its honeycomb structure c and d after dismantling the damaged worn out portion of flue gas ducts for overhaul of unit ix
Read morePatch welding to be done for rectification of damaged flue gas duct from aph-a hopper to chimeny along the path ab side flue gas duct and its honeycomb structure ( ab) after dismantling the damaged / worn out portion of flue gas ducts for overhaul of unit ix
Patch welding to be done for rectification of damaged flue gas duct from aph a hopper to chimeny along the path ab side flue gas duct and its honeycomb structure ( a and b) after dismantling the damaged worn out portion of flue gas ducts for overhaul of unit ix
Read moreSupply, delivery, erection, testing and commissioning of wall mounted, 5 star, bee rating, inverter type split ac machines having capacity 48 nos x 2 tr for replacement of existing ac machine.condenser and evaporator unit of the stated ac machine
Supply, delivery, erection, testing and commissioning of wall mounted, 5 star, bee rating, inverter type split ac machines having capacity 48 nos x 2 tr for replacement of existing ac machine.condenser and evaporator unit of the stated ac machine&#x0d &#x0d
Read moreof your Industry type