Tender Details
About Tender
🏗️ Bharat Coking Coal Limited (Bccl) Is Seeking Bids For The Replacement Of Critical Components At Moonidih Coal Washery. 🛠️ The Scope Of Work Includes The Dismantling And Replacement Of The Drive Drum Assembly For Unit 402 And The Snub Drum Assembly For Unit 903, Both Of Which Are Integral To The Belt Conveyor System. The Existing Drums Have Reached The End Of Their Operational Life And Require Immediate Replacement To Ensure Continued Operations. 📅 Bid Submission Deadline: June 1, 2024, 5:00 Pm A Tender Fee Of Inr 6300 Is Applicable, With No Emd Required. Interested Bidders Must Possess The Necessary Technical Expertise And Equipment To Handle The Dismantling And Installation Of These Components. Proposals Should Include Detailed Methodologies, Timelines, And Cost Estimates For The Successful Completion Of The Project. Keywords: Bharat Coking Coal Limited, Moonidih Coal Washery, Drive Drum Assembly, Snub Drum Assembly, Belt Conveyor, Public Sector Undertaking, Tender, Bid Submission, Procurement, Replacement Of EquipmentParticulars | Details |
---|---|
Title |
Replacement Of The Drive Drum Assembly For Unit 402 Belt Conveyor And Snub Drum Assembly For Unit 903 Belt Conveyor After Dismantling Of Existing Worn Out Drums At Moonidih Coal Washery.
|
Description |
Replacement Of The Drive Drum Assembly For Unit 402 Belt Conveyor And Snub Drum Assembly For Unit 903 Belt Conveyor After Dismantling Of Existing Worn Out Drums At Moonidih Coal Washery.
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2024_BCCL_308818_1 |
Reference Number |
BCCL/PO/MND/EnM/E -Tender/2024-25/E 163 |
Tender Fee | 0 |
EMD | 6300 |
Tender Value | |
Place | MOONIDIH WASHERY |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=320000 |
Start Date | May 24, 2024 14:30 |
End Date |
01/06/2024 ( Expired 347 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Nctps i se m ii circle ichs dn replacement of the worn out damaged rail track of reclaimer i stacker i in conveyor 7 at the side of coal yard 2 from 345 m to 696 m
Read moreReplacement of drive drum, driven drum gear and motor after dismantling at tb1 tendem belt at nakrakonda kumardihi b colliery under bankola area
Replacement of drive drum, driven drum gear and motor after dismantling at tb1 tendem belt at nakrakonda kumardihi b colliery under bankola area
Read moreThe work of repairing / strengthening of base structure for drive system (gearbox, motor, drive drum and snub drum) including their supporting structure along with its alignment and repairing of its change-over gate for unit 502 belt conveyor at mnd
The work of repairing / strengthening of base structure for drive system (gearbox, motor, drive drum and snub drum) including their supporting structure along with its alignment and repairing of its change-over gate for unit 502 belt conveyor at mnd
Read moreMtps i bm unit i boiler pressure parts aoh 2025 maintenance of burners and replacement of worn out fasteners at cover plates
Mtps i bm unit i boiler pressure parts aoh 2025 maintenance of burners and replacement of worn out fasteners at cover plates
Read moreRepairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.
Repairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.
Read morePatch welding to be done for rectification of damaged flue gas duct from aph-b hopper to chimeny along the path cd side flue gas duct and its honeycomb structure ( cd) after dismantling the damaged / worn out portion of flue gas ducts for overhaul of unit ix
Patch welding to be done for rectification of damaged flue gas duct from aph b hopper to chimeny along the path cd side flue gas duct and its honeycomb structure c and d after dismantling the damaged worn out portion of flue gas ducts for overhaul of unit ix
Read morePatch welding to be done for rectification of damaged flue gas duct from aph-a hopper to chimeny along the path ab side flue gas duct and its honeycomb structure ( ab) after dismantling the damaged / worn out portion of flue gas ducts for overhaul of unit ix
Patch welding to be done for rectification of damaged flue gas duct from aph a hopper to chimeny along the path ab side flue gas duct and its honeycomb structure ( a and b) after dismantling the damaged worn out portion of flue gas ducts for overhaul of unit ix
Read moreCarriage of spillaged coal from the raw coal section by manual labor including loading unloading and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project
Carriage of spillaged coal from the raw coal section by manual labor including loading unloading 
 and stacking to belt/chute/suitable place for a lead less than 0.1 km for a period of 03(three) months at rajrappa washery project
Read moreProposed renovation of toilets, replacement of windows and other misc. works at 2nd floor gf of bo building amritsar pb for making it ready for shifting bo-150 unit 4 so clia from existing rented premises
Proposed renovation of toilets, replacement of windows and other misc. works at 2nd floor gf of bo building amritsar pb for making it ready for shifting bo-150 unit 4 so clia from existing rented premises
Read moreInstallation of street lights on existing lt poles at yatra base camp mirbazar and walnut factory qazigund and their dismantling after culmination of yatra and back carriage to divisional stores for sanjy 2025.
Installation of street lights on existing lt poles at yatra base camp mirbazar and walnut factory qazigund and their dismantling after culmination of yatra and back carriage to divisional stores for sanjy 2025.
Read moreof your Industry type