Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Echp I Replacement Of Worn Out M.S Chequered Plate By A Newly Fabricated Ms Chequered Plate In And Around Sfd 4 A 4 B Floors At Secondary Crusher House I
|
Description |
Ttps Echp I Replacement Of Worn Out M.S Chequered Plate By A Newly Fabricated Ms Chequered Plate In And Around Sfd 4 A 4 B Floors At Secondary Crusher House I
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_515401_1 |
Reference Number |
CE/SE/MI/TTPS/143/2024-2025 |
Tender Fee | 0 |
EMD | 8100 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=613081 |
Start Date | December 30, 2024 21:30 |
End Date |
17/01/2025 ( Expired 172 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Echp-ii- complete dismantling of dust extraction, impeller casing, 4 nos. worn out wet collecting hoppers, bed frame structure of des dust extraction system-4b repairing and commissioning work at secondary crusher house-ii.
Echp-ii- complete dismantling of dust extraction, impeller casing, 4 nos. worn out wet collecting hoppers, bed frame structure of des dust extraction system-4b repairing and commissioning work at secondary crusher house-ii.
Read moreTtps mech ii tm i unit iii overhauling of stator water primary secondary pumps hydrogen cooler booster pump, working oil coolers lub oil coolers of bfp and cooling water valves renewal of worn out bcw acw cooling water pipes and renewal of gaskets in
Ttps mech ii tm i unit iii overhauling of stator water primary secondary pumps hydrogen cooler booster pump, working oil coolers lub oil coolers of bfp and cooling water valves renewal of worn out bcw acw cooling water pipes and renewal of gaskets in
Read moreMtps i mill plant unit iv complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in 4a to 4f
Mtps i mill plant unit iv complete dismantling and assembling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in 4a to 4f
Read moreEchp-i- replacement of existing worn out gear box scn 450 by reconditioned gear box scn-450 in conveyor-45
Echp-i- replacement of existing worn out gear box scn 450 by reconditioned gear box scn-450 in conveyor-45
Read moreEchp-i- cutting and removing the worn out and damaged rack and pinion gate and newly fabricated rack and pinion gate and erecting in its position in screen c and bypass gate at sch-i.
Echp-i- cutting and removing the worn out and damaged rack and pinion gate and newly fabricated rack and pinion gate and erecting in its position in screen c and bypass gate at sch-i.
Read moreEchp-i- erection of y chute and receiving chute of m16 vibrex screen 20a 20b at secondary crusher house-i
Echp-i- erection of y chute and receiving chute of m16 vibrex screen 20a 20b at secondary crusher house-i
Read moreEchp-i- replacement of ht/lt motors by spare motors, transporting of released motors to convenient location, complete overhauling of motors and further transporting nearby to bed location at conveyor-13a,14 and 15 in red gate area.
Echp-i- replacement of ht/lt motors by spare motors, transporting of released motors to convenient location, complete overhauling of motors and further transporting nearby to bed location at conveyor-13a,14 and 15 in red gate area.
Read moreEchp-ii- dismantling and renewal of existing worn out support i beam, tripper chute floor and walkways structures in conveyor-68 by new sh materials
Echp-ii- dismantling and renewal of existing worn out support i beam, tripper chute floor and walkways structures in conveyor-68 by new sh materials
Read moreTtps operation circle cad acwph i inspection, checking of supply and pipe lines of bearing cooling water, arresting leakages and assisting the shift engineer in all activities at auxiliary cooling water pump house i by recording the paramete
Ttps operation circle cad acwph i inspection, checking of supply and pipe lines of bearing cooling water, arresting leakages and assisting the shift engineer in all activities at auxiliary cooling water pump house i by recording the paramete
Read moreReplacement of damaged/ worn out foot valves, gi/ ms bends, gi/ ms pipes, vibration pads, mug ers, door extension with ramp at pump house i.
Replacement of damaged/ worn out foot valves, gi/ ms bends, gi/ ms pipes, vibration pads, mug ers, door extension with ramp at pump house i.
Read moreof your Industry type