Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ichp Dismantling The Existing Damaged Corroded Floor Chequered Plates And Ms Channels And Erection Of New Chequered Plates And Channels In Conveyor 26 A B Take Up Floor.
|
Description |
Ichp Dismantling The Existing Damaged Corroded Floor Chequered Plates And Ms Channels And Erection Of New Chequered Plates And Channels In Conveyor 26 A B Take Up Floor.
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 4000 |
Tender Value | |
Place | TTPS |
Link |
AAAAAAAAAA Login to view |
Start Date | July 01, 2025 14:30 |
End Date |
15/07/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling, fabrication and erection of urea product conveyor o - 602 base structure, gallery and supports in tar 2025
Dismantling, fabrication and erection of urea product conveyor o - 602 base structure, gallery and supports in tar 2025
Read moreReplacing of damaged old false ceiling with new false ceiling along with necessary electrical works in new chemical and biotechnology department building conference hall (5th floor) at nit warangal.
Replacing of damaged old false ceiling with new false ceiling along with necessary electrical works in new chemical and biotechnology department building conference hall (5th floor) at nit warangal.
Read moreReplacement of existing wornout steel structural members and roofing sheets by new from column 38 to column 42 of conveyor 17 after dismantling and devolution of removed steel structures and other materials at central stores
Replacement of existing wornout steel structural members and roofing sheets by new from column 38 to column 42 of conveyor 17 after dismantling and devolution of removed steel structures and other materials at central stores
Read moreReplacing the existing damaged mosaic floor with vitrified floor tile and providing aluminum partition in the newly establishing nmr spectrometer laboratory at department of chemistry
Replacing the existing damaged mosaic floor with vitrified floor tile and providing aluminum partition in the newly establishing nmr spectrometer laboratory at department of chemistry
Read moreIchp- dismantling the existing damaged corroded floor chequered plates and ms channels and erection of new chequered plates and channels in conveyor-26a b take up floor.
Ichp- dismantling the existing damaged corroded floor chequered plates and ms channels and erection of new chequered plates and channels in conveyor-26a b take up floor.
Read moreEchp-ii- dismantling and renewal of existing worn out support i beam, tripper chute floor and walkways structures in conveyor-68 by new sh materials
Echp-ii- dismantling and renewal of existing worn out support i beam, tripper chute floor and walkways structures in conveyor-68 by new sh materials
Read moreFabrication, erection and making of new by pass chute in between 949 belt conveyor in rlb section including scrapper, side guard and rollers fitting as per requirement in rlb section of kathara washery
Fabrication, erection and making of new by pass chute in between 949 belt conveyor in rlb section including scrapper, side guard and rollers fitting as per requirement in rlb section of kathara washery
Read moreA)repairing and thorough overhauling of gear box gs-50 of unit no. 929 belt conveyor and (b)repair, replacement and changing of gs-14a type gear box chain sprocket and drum side sprocket of new bunker washed coal power in rlb section of kathara washe
A)repairing and thorough overhauling of gear box gs-50 of unit no. 929 belt conveyor and (b)repair, replacement and changing of gs-14a type gear box chain sprocket and drum side sprocket of new bunker washed coal power in rlb section of kathara washe
Read moreDismantling of head drum of unit no. 180 b/c and 181 b/c then repairing, fabrication, erection and installation of the same including repairing of its supporting structure in raw coal section of kathara washery
Dismantling of head drum of unit no. 180 b/c and 181 b/c then repairing, fabrication, erection and installation of the same including repairing of its supporting structure in raw coal section of kathara washery
Read moreNew construction of manhole to main theppakulam 4th street american mission lane lakshmipuram supply and raising the existing damaged manhole at various places in ward no 46
New construction of manhole to main theppakulam 4th street american mission lane lakshmipuram supply and raising the existing damaged manhole at various places in ward no 46
Read moreof your Industry type