Tender Details
About Tender
🛣️ Invitation For Bids: Road Strengthening Project In Gurugram 🛣️ The Haryana Government Is Seeking Bids From Experienced Contractors For The Strengthening Of A Road Segment On The Gurugram Alwar Road, From Hariahera Via Ram Swaroop Ki Samadhi, Covering A Distance Of 2.59 Km (Road Id 10287), Under The 2023 2024 Work Programme. 📅 Bid Submission Deadline: June 21, 2024, 5:00 Pm Tender Fee: Inr 16,180 Emd: Inr 216,680 Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, Adhering To The Guidelines Provided In The Tender Document. Keywords: Road Strengthening, Infrastructure, Haryana Government, Gurugram, Alwar Road, Hariahera, Tender, Bid Submission, Emd, Tender FeeParticulars | Details |
---|---|
Title |
Providing Strengthening Of Road From Gurugram Alwar Road To Hariahera Via Ram Swaroop Ki Samadhi From Km 0.00 To 2.59 In Gurugram Distt. (Road Id 10287)(Work Programme 2023 2024) (Recall)
|
Description |
Providing Strengthening Of Road From Gurugram Alwar Road To Hariahera Via Ram Swaroop Ki Samadhi From Km 0.00 To 2.59 In Gurugram Distt. (Road Id 10287)(Work Programme 2023 2024) (Recall)
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2024_HRY_375056_1 |
Reference Number |
202490BDE3E0 3F29 4F25 82CD 9DEC344F8664621BAR |
Tender Fee | 16180 |
EMD | 2.17 Lakh |
Tender Value | |
Place | Hariahera |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=450997 |
Start Date | June 08, 2024 22:30 |
End Date |
21/06/2024 ( Expired 303 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreProviding short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.
Providing short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.
Read moreWbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)
Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.
Read moreAAAAAAAAAA
Login to viewGhospara road from 2.00 km to 9.00 km and 17.50 km to 21.00 km- strengthening work under barrackpore division, p.w.d. in the district of north 24 parganas. during the year 2024-25..2nd call
Read moreG.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.
G.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.
Read moreDharmapuri district - strengthening of the road from mrl-15 galegounadanur to pudupatti (via) errabaiyanahalli, karubaiyanahalli, nekkunthi km. 0/0 - 4/800 in package no.tn04-272
Strengthening of the road from mrl-15 galegounadanur to pudupatti (via) errabaiyanahalli, karubaiyanahalli, nekkunthi km. 0/0 - 4/800
Read moreStrengthening of road from of mrl-04 kallal koomachipatti road to sembanoor (via) meenakshipuram road km 0/0-4/460
Strengthening of road from of mrl-04 kallal koomachipatti road to sembanoor (via) meenakshipuram road km 0/0-4/460
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreConstruction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Read moreof your Industry type