Tender Details

Particulars Details
Title
Improvement Of Riding Quality Pavement Of Khunti Torpa Kolebira (Sh 03) Road From Km 5.00 To Km 56.00 (Total Length 52.00 Km) (Carriageway 10.00 M)
Description
Improvement Of Riding Quality Pavement Of Khunti Torpa Kolebira (Sh 03) Road From Km 5.00 To Km 56.00 (Total Length 52.00 Km) (Carriageway 10.00 M)
Organisation Government of Jharkhand
Tender Id 2023_CECOM_78786_1
Reference
Number
RCD/KHUNTI/1048
Tender Fee 10000
EMD 54.96 Lakh
Tender Value
Place Chairman, e-proc, Cell Rm No. 330A, Ranchi
Link https://jharkhandtenders.gov.in
Start Date December 18, 2023 16:00
End Date

02/01/2024 ( Expired 499 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Read more
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik

Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Read more
Strengthening of tumsar to bhandara section of nh-543k from km 82.00 to km 112.00 (excluding section from km 108.00 to 110.00) on epc mode in the state of maharashtra. total length 28.00 km

Strengthening of tumsar to bhandara section of nh-543k from km 82.00 to km 112.00 (excluding section from km 108.00 to 110.00) on epc mode in the state of maharashtra. total length 28.00 km

Read more
Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana

Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise