Tender Details

Particulars Details
Title
Improvement Of Riding Quality Pavement Of Khunti Torpa Kolebira (Sh 03) Road From Km 5.00 To Km 56.00 (Total Length 52.00 Km) (Carriageway 10.00 M)
Description
Improvement Of Riding Quality Pavement Of Khunti Torpa Kolebira (Sh 03) Road From Km 5.00 To Km 56.00 (Total Length 52.00 Km) (Carriageway 10.00 M)
Organisation Government of Jharkhand
Tender Id 2023_CECOM_78786_1
Reference
Number
RCD/KHUNTI/1048
Tender Fee 10000
EMD 54.96 Lakh
Tender Value
Place Chairman, e-proc, Cell Rm No. 330A, Ranchi
Link https://jharkhandtenders.gov.in
Start Date December 18, 2023 16:00
End Date

02/01/2024 ( Expired 546 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Develop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km

Develop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km

Read more
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Read more
Construction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode

Construction of road kibithu kundao from km 0.000 to km 52.000&#x0d design length 0.000 to 19.557 kms green field alignment to nhsl&#x0d specifications under project udayak in anjaw district of arunachal&#x0d pradesh state on epc mode&#x0d

Read more
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Read more
Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Rehabilitation and upgradation of patur-balapur-shegaon section of nh-161g from design km 0-000 to km 33-200 and design km 36-600 to km 53-090 (total length-49.600 km) to 4lps configuration in the state of maharashtra on epc mode

Read more
Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Upgradation to two lane with paved shoulder configuration from km0.000 to km 62.822 (limbdi - dharangadhra) of nh-51 in the state of gujarat on hybrid annuity mode (ham) (total length- 62.822 km).

Read more
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Read more
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh

Read more
Upgradation of bsnl office to railway crossing in bhandara city from chainage km 168/180 to km 168/920 (length 0.740 km) of nh-247 to two lane with paved shoulder configuration of bhandara-khat-ghotitok road in the state of maharashtra on epc mode

Upgradation of bsnl office to railway crossing in bhandara city from chainage km 168/180 to km 168/920 (length 0.740 km) of nh-247 to two lane with paved shoulder configuration of bhandara-khat-ghotitok road in the state of maharashtra on epc mode

Read more
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise