Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Bandr/Ere/71079/Td/ Lc/Painting/030
|
Description |
Painting Of Platform Shed Structures At Santragachi Station Development Site For Execution Of Construction Of New Island Platform And Refurbishing Of Existing Platform Shed At Santragachi Railway Station In West Bengal.
|
Organisation | Department of Heavy Industry | Central Govt. Ministry/Department |
Tender Id | 2025_DHI_795211_1 |
Reference Number |
BANDR/ERE/71079/TD/ LC/PAINTING/030 |
Tender Fee | 590 |
EMD | 26000 |
Tender Value | |
Place | Santragachi Station Development project Santragach |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1099736 |
Start Date | April 16, 2025 18:10 |
End Date |
29/04/2025 ( Expired 65 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreCs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Read moreDevelopment, operation and maintenance of ropeway project from kamakhya railway station to kamakhya temple on dbfot mode in the state of assam.
Development, operation and maintenance of ropeway project from kamakhya railway station to kamakhya temple on dbfot mode in the state of assam.
Read moreBtps(4x270mw)
Design, engineering, manufacture, supply, assembly, testing at manufacturers works, inspection, packing for inland freight, forwarding, transit insurance, delivery for site, erection, supervision, testing and commissioning of new conveying system for di of raw coal including modification works in the existing crusher house and construction of space frame structure raw coal storage shed with all accessories, mandatory spares, tools and tackles including all mechanical, electrical, cni, civil, structural works, dust suppression, dust extraction and fire fighting system at btps(4x270mw) project.
Read moreRequest for proposal for (rfp) selection of transaction advisor for development of new outer harbour at chennai port on design, build, finance, operate and transfer (dbfot) basis
Request for proposal for (rfp) selection of transaction advisor for development of new outer harbour at chennai port on design, build, finance, operate and transfer (dbfot) basis
Read moreConstruction of shed and office cum guard room for separation at trenching ground molimohgaon (augmentation of existing processing facility for solid waste management) mandla dist. mandla (m.p.)
Construction of shed and office cum guard room for separation at trenching ground molimohgaon (augmentation of existing processing facility for solid waste management) mandla dist. mandla (m.p.)
Read moreConstruction of overhead water tank and onground water tank for p-1185 at rr site, kota, rajasthan
Construction of overhead water tank and onground 
 water tank for p-1185 at rr site, kota, rajasthan
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreConstruction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle.
Construction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreof your Industry type